Laserfiche WebLink
EXHIBIT B-1 <br />FEE SCHEDULE OF HOURLY BILLING <br />The fee schedule included herein for Phase 4 work is a preliminary estimate. <br />The work to be done under Phase 4 is dependent upon the scope and amount of <br />work deemed required at the completion of Phase 2 and 3. The Contractor shall <br />submit a revised fee schedule at that time. The revised fee schedules shall <br />be subject to review and approval by the City and will become a part of a new <br />agreement. <br />FEE SCHEDULE FOR PHASE 2 WORK <br />The following fee schedule is for the tasks outlined in Exhibit A for Phase 2 <br />work: <br />1. Seismic Assessment Calculations and Effluent Outfall Bypass Study <br />A. Prepare assessment <br />calculation <br />submittal <br />Project Engineer <br />16 hours <br />@ <br />$ 90.00/hour = <br />$ <br />1,440.00 <br />Consultant <br />16 hours <br />@ <br />$110.00/hour = <br />$ <br />1,760.00 <br />Engineer <br />16 hours <br />@ <br />$ 80.00/hour = <br />$ <br />1,280.00 <br />Subtotal <br />$ <br />4,480.00 <br />B. Outfall bypass study <br />Senior Engineer <br />8 hours <br />@ <br />$110.00/hour = <br />$ <br />880.00 <br />Project Engineer <br />32 hours <br />@ <br />$ 90.00/hour = <br />$ <br />2,880.00 <br />Consultant <br />16 hours <br />@ <br />$110.00/hour = <br />$ <br />1,760.00 <br />Drafter <br />8 hours <br />@ <br />$ 60.00/hour = <br />$ <br />480.00 <br />Cost Estimator <br />8 hours <br />@ <br />$100.00/hour = <br />$ <br />800.00 <br />Subtotal <br />$ <br />6,800.00 <br />2. Retrofit contract documents, cost <br />estimates, <br />construction <br />schedule and <br />meetings <br />Principal <br />40 hours <br />@ <br />$125.00/hour = <br />$ <br />5,000.00 <br />Senior Engineer <br />80 hours <br />@ <br />$110.00/hour = <br />$ <br />8,800.00 <br />Project Engineers <br />750 hours <br />@ <br />$ 90.00/hour = <br />$ <br />22,500.00 <br />Consultant <br />100 hours <br />@ <br />$110.00/hour = <br />$ <br />11,000.00 <br />Drafter <br />300 hours <br />@ <br />$ 60.00/hour = <br />$ <br />18,000.00 <br />Engineer <br />280 hours <br />@ <br />$ 80.00/hour = <br />$ <br />22,400.00 <br />Subtotal <br />$ <br />87,700.00 <br />3. Allowance for cost estimator <br />$ <br />6,000.00 <br />Exhibit B <br />Page 3 of 6 <br />9/26/88 Rev. <br />1/10/90 Rev. <br />2/6/90 Rev. <br />5/15/92 Rev. <br />