Laserfiche WebLink
FEE SCHEDULE FOR PHASE 4 WORK - CONSTRUCTION ADMINISTRATION AND SUPPORT <br />The following fee schedule is for the tasks outlined in Exhibit A for Phase 4 <br />work: <br />1. Consultation, Shop Drawings, and <br />Field <br />Inspection (based on <br />an <br />assumed <br />26 week construction <br />period): <br />Principal <br />8 <br />hours <br />@ <br />$125.00/hour = <br />$ <br />1,000.00 <br />Senior Engineer <br />8 <br />hours <br />@ <br />$110.00/hour = <br />$ <br />880.00 <br />Project Engineer <br />52 <br />hours <br />@ <br />$ 90.00/hour = <br />$ <br />4,680.00 <br />Engineer <br />52 <br />hours <br />@ <br />$ 80.00/hour = <br />$ <br />4,160.00 <br />Consultant <br />24 <br />hours <br />@ <br />$110.00/hour = <br />$ <br />2,640.00 <br />Drafter <br />52 <br />hours <br />@ <br />$ 60.00/hour = <br />$ <br />3,120.00 <br />Clerical <br />52 <br />hours <br />@ <br />$ 50.00/hour = <br />$ <br />2,600.00 <br />Subtotal <br />$19,080.00 <br />Reimbursable Expense <br />$ <br />1,300.00 <br />TOTAL FEES - PHASES 4 $20,380.00 <br />Exhibit B <br />Page 5 of 6 <br />9/26/88 Rev. <br />1/10/90 Rev. <br />2/6/90 Rev. <br />5/15/92 Rev. <br />