My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1996-096 to 100
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1996
>
Reso 1996-096 to 100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 1:34:51 PM
Creation date
7/14/2022 1:24:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />I. PROJECT DESCRIPTION <br />The project consists of design services for the seismic retrofit of <br />facilities at the Water Pollution Control Plant at 3000 Davis Street in <br />San Leandro, California. The project also includes design services for <br />the seismic retrofit of various sewage and stormwater pumping stations <br />also located in San Leandro. The design services for the WPCP and the <br />sewage and storm water pumping stations shall implement the <br />recommendations as described in the WPCP Seismic Retrofit Program <br />prepared by the Sear -Brown Group in October of 1995. The following <br />facilities are included in the project: <br />1. Buildings: <br />A. Control Building <br />B. Old Control Building <br />C. Maintenance Shop (old flammable storage building) <br />2. Chlorination System: <br />A. Chlorine Handling Facility (may not be included in phase 2 <br />work) <br />B. Chlorine Contact Tank (may not be included in phase 2 work) <br />C. Number 3 Water Pumping System <br />3. Digester Gas -Domes and Lines: <br />A. Digesters 1 and 4; Secondary Digesters 2. <br />4. Emergency Generator System and Power Generation Station: <br />A. Motor/Generator, Transfer Switch, and Transformer <br />B. Above Grade Fuel Tank <br />5. Headworks Pumping Station: <br />A. Pumps and Piping <br />B. Structure <br />6. Primary Clarification: <br />A. <br />Primary <br />Clarifiers 1 and 2 <br />B. <br />Primary <br />Settling <br />Tanks <br />C. <br />Related <br />Pumps and <br />Piping <br />D. <br />Emergency Polymer <br />System <br />E. <br />Ferrous <br />Chloride <br />System <br />Exhibit A <br />Page 1 of 6 <br />9/26/88 Rev. <br />1/10/90 Rev. <br />
The URL can be used to link to this page
Your browser does not support the video tag.