My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1996-131 to 135
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1996
>
Reso 1996-131 to 135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 2:05:47 PM
Creation date
7/14/2022 1:57:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PG&E's sole discretion. Unless otherwise agreed to in writing by PG&E, any consent by <br />PG&E shall not relieve Permittee of any obligations under this Agreement. Any <br />assignment which does not comply with the provisions of this Section 1.3 shall be null <br />and void; and without limiting the foregoing, Permittee agrees that it will give PG&E <br />prior written notice of any change in its name, any transfer of all or a portion of Pole <br />Attachments system, any transfer of substantially all its assets and/or any major change in <br />its form of doing business, including but not limited to incorporation, dissolution, merger, <br />reorganization, and bankruptcy proceedings. <br />ARTICLE II <br />:• ► '• Ir :••u �► <br />2.1 RESERVATION OF RIGHTS. PG&E EXPRESSLY RESERVES THE RIGHT TO <br />DENY PERMITTEE ADDITIONAL ATTACHMENTS TO PG&E POLES OR OTHER <br />POLES AND/OR FACILITIES. THIS PARAGRAPH DOES NOT PERTAIN TO <br />PERMITTEE'S REPLACEMENT OF EXISTING POLE ATTACHMENTS ON <br />EXISTING PG&E POLES. <br />2.2 ADDITIONAL CONTACTS. The Permittee shall not install any additional Pole <br />Attachments on the PG&E Poles without first securing PG&E's written approval on a <br />Contact Permit form. Upon receiving the written consent of PG&E, Permittee shall <br />have the privilege of installing, maintaining, and placing additional. Pole Attachments on <br />such PG&E Poles specified in said consent on the terms and conditions specified in this <br />Agreement, except as modified therein, which shall be considered a part of each and <br />every such consent irrespective of whether this Agreement is expressly referred to in such <br />consent. <br />• ul <br />(a) The Permittee shall install and maintain the Pole Attachments in conformity <br />with all applicable laws, rules, and regulations of state and federal governments, <br />agencies, and other governmental authorities, including, but not limited to, the <br />California Public Utilities Commission ("CPUC"), and in conformity with any <br />safety standards or requirements as may be required or specified by PG&E in <br />its sole discretion. All Pole Attachments must adhere to the clearance, <br />separation, windloading and dead-end tensions and other requirements of <br />General Order No. 95. Neither the requirement that Permittee follow said <br />practices, applicable laws, rules and regulations or special instructions given by <br />PG&E nor the adherence thereto by Permittee shall relieve Permittee for the <br />sole responsibility to maintain safe and efficient working conditions. Nothing <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.