Laserfiche WebLink
EXI-IIRIT "A" PAYMENT <br />Paolo 2 <br />ITEM <br />1Jp, <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />ITEM <br />COS1 <br />DIRECT <br />COSTS <br />CITY <br />ACFC <br />n_aso Bid Items <br />-- <br />23 <br />Relocate Existing Time Capsule <br />1 <br />Lump Sum <br />$250.00 <br />$250.00 <br />$250.00 <br />24 <br />Relocate Two Existing Stono Lions <br />1 <br />Lump Sum <br />$1.000.00 <br />$1,000.00 <br />$1,000.00 <br />25 <br />Relocnlo Existing Flagpole <br />I <br />Lump Sum <br />$1.400.00 <br />$1.400.00 <br />$1,400.00 <br />26 <br />Relocate Two Existing Picnic Tablas <br />1 <br />Lump Sum <br />$200.00 <br />$200.00 <br />$200.00 <br />1' 27 <br />Relocate Existing Callrans Sions <br />I <br />Lump Sum <br />$200.00 <br />$100.00 <br />$100.00 <br />28 <br />Supply and Install Now Benches <br />6 <br />Each <br />$1.000.00 <br />$6,000.00 <br />$6.000.00 <br />29 <br />Supply and Install Now Bollards <br />2 <br />Each <br />$500.00 <br />$1.000.00 <br />$1.000.00 <br />30 <br />Supply and Install New Trnsh <br />5 <br />Each <br />$670.00 <br />$3.350,00 <br />$3.350.00 <br />Receptacles <br />31 <br />Supply and Install Now Picnic Table <br />1 <br />Lump Stlln <br />$1.200 00 <br />$1,200.00 <br />$1,200 00 <br />32 <br />Supply and Install Drinking Founlnin <br />1 <br />Lump Sum <br />$5.500,00 <br />$5,500.00 <br />$5,500 00 <br />33 <br />Sheeting, Shoring and Bracing <br />1 <br />Lump Sum <br />$500,00 <br />$500.00 <br />$500.00 <br />ADDITIVE BID ITEM <br />I <br />Concrete briduo Rail and Footing <br />1 <br />Lump Sum <br />$22.600.00 <br />$22,600.00 <br />$22,600 00 <br />2 <br />Two Bridge Rail Lights <br />1 <br />Lump Sum <br />$5.300 00 <br />$5.300.00 <br />$5,300 00 <br />3 <br />Clean and Paint Under Bridgo <br />1 <br />Lump Sum <br />$5,800.00 <br />$5,1300,00 <br />$5.800.00 <br />SIIARED COSTS <br />CITY -I ACFC <br />AFMARK <br />1 Various Change Ordors not 1 Lump Surn $60.312.86 $60,312.86 $60.312.86 3 <br />rellecled in Base Bid and <br />Additive Bid Itonls Above <br />TOTALS $672.742.46 $360.809.46 $220,485 00 $91,448 00 <br />Percent of Total Cost' 54qt 3MI 14? <br />Remarks: <br />Total City Cost: $581.294.46 86s 1 — Creek Restoration work cost share based on area within creek zones. Zones I and 2 areas within which County originally agtood <br />Total District Cost $91.448.00 14% to contribute. Zones 1 and 2 include 55% of the creek restoration work, with Iho City's portion the remaining 45%. <br />Total Combined Cost: $672.7,12.46 100% 2 — Related work within zones 1 and 2. <br />3 — Construction change. <br />GPM:mc 7/31/96 4 — Change in design and construction required due to concealed slope conditions exposed allot clearing and gnrbbing oputalion. <br />F:ILOTUS%EXHIBIT2.WK1 <br />