My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1997-021 to 025
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1997
>
Reso 1997-021 to 025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 3:29:46 PM
Creation date
7/14/2022 3:23:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1997
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lease Area Maps - Definitions <br />"Reservation of Rights" <br />Shows approximate area of reservation of real property interest by the Alameda Reuse <br />and Redevelopment Authority ("ARRA") to permit access for the ARRA, the City of Alameda, <br />its agents or assigns, including utility providers (collectively, the "City"), for maintenance and <br />repair of existing utilities, which are obligations of the City (the "Maintenance Obligations"). <br />City shall use reasonable care in performing the Maintenance Obligations, and shall hold the <br />ARRA and its tenants/subtenants ("Lessee") harmless from damage caused by failure to perform <br />the Maintenance Obligations. Use by the City of a Reservation of Rights area shall be limited to <br />maintenance of existing utilities and shall not be extended to allow placement of additional <br />utilities in the Reservation of Rights area. Utilities located in a Reservation of Rights area shall <br />be relocated to the public right-of-way when major upgrading of utility systems occurs, at which <br />time the ARRA shall quitclaim its interest in the Reservation of Rights area to the Lessee. Lessee <br />may landscape over a Reservation of Rights area, to the extent such landscaping is consistent with <br />the obligation of the City to maintain utilities within the Reservation of Rights area. <br />"Reservation of Rights (Future Imp.)" <br />Shows area of reservation of real property interest by the Alameda Reuse and <br />Redevelopment Authority ("ARRA") to permit access for the ARRA, the City of Alameda, its <br />agents or assigns, including utility providers (collectively, the "City"), for contemplated future <br />installation and maintenance of curbs, gutters, sidewalks, utilities, and landscaping in connection <br />with construction or upgrading of streets and major upgrading of utility systems ("Future <br />Sidewalk and Utility Improvements"). City shall use reasonable care in siting and maintaining <br />the Future Sidewalk and Utility Improvements, and shall hold the ARRA and its <br />tenants/subtenants ("Lessee") harmless from damage caused by failure to maintain the Future <br />Sidewalk and Utility Improvements. Lessee may landscape over an unused Reservation of Rights <br />area, to the extent such landscaping is consistent with the obligation of the City to maintain the <br />Future Sidewalk and Utility Improvements. <br />"License Area" <br />Shows approximate area where adjoining subleaseholders provide each other with <br />necessary licenses, which may be documented in additional agreements between sublessees at <br />their option. <br />ifilcII�Y_liirLi : � <br />
The URL can be used to link to this page
Your browser does not support the video tag.