Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />12.6.105: ELECTRICAL. <br />(b) (a) Electrical Permit. General The fee for an electrical permit shall include an issuance fee of $16.00 <br />$22.00 plus the amount shown below for each electrical item involved in the work. <br />(,e) (b) Minimum Electrical Permit Fee plus each $48.00 <br />item installed, based on the following table: <br />Circuits: <br />Installation, replacement or alteration of each <br />electrical circuit (includes related outlets, <br />switches, receptacle and lighting fixtures): <br />1 to 20 ampere circuit <br />21 to 30 ampere circuit <br />31 to 40 ampere circuit <br />41 to 50 ampere circuit <br />51 to 70 ampere circuit <br />71 to 100 ampere circuit <br />101 to 200 ampere circuit <br />Over 200 ampere capacity <br />Busway duet Trolley & plug-in type busways, <br />per linear foot (en e� <br />$7.50 <br />$8.25 <br />$8.50 <br />$9.25 <br />$10.00 <br />$12.50 <br />$18.25 <br />$18.50 PLUS $5.50 for each <br />additional 100 ampere capacity or <br />fraction thereof. <br />$.35 <br />04-07-97 4 Electrical Code <br />