Laserfiche WebLink
(m) The Subdivider shall provide archaeological monitoring of all construction activities on the <br />site. There shall be an archaeologist on site at all times during excavation/grading activity. <br />(n) In the event that archaeological or historical resources are discovered during <br />excavation/grading, work shall be suspended and a qualified archaeologist or historian shall be hired at <br />Subdivider's expense to examine the findings and to recommend appropriate mitigation. Said mitigation <br />shall be reviewed and approved by the Planning Commission and City Council. <br />(o) All fill material imported to the project site shall be tested for toxicity. The applicant shall <br />submit the results of such testing to the City. Fill material which has toxicity levels in excess of permissible <br />local, state or federal levels shall not be used on the project site. <br />(p) All metal fences and ancillary structures in the right-of-way and in close proximity to the <br />transmission lines shall be grounded, in accordance with applicable specifications, to eliminate potential <br />electric shocks. Appropriate cautionary signing shall also be installed. <br />Dated: 11117172 <br />CITY OF SAN LEANDRO, a municipal <br />corporation <br />By: <br />HN J. JERMANIS <br />City Manager <br />RYLAND HOMES OF CALIFORNIA, INC., a <br />Delaware corporation, Owner(s) <br />Dated: [ D I a(e Lin, By: A77�� <br />r A Signa e <br />V v� <br />Print name <br />Title <br />TRACT MAP 7093 MEDALLION PHASE 1 <br />SUBDIVISION IMPROVEMENT AGREEMENT (PUBLIC IMPROVEMENT) <br />C:\MAPSM093\SUBIMPI.ABS <br />PAGE 16 OF 17 <br />