My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1999-166
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1999
>
Reso 1999-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 10:25:38 AM
Creation date
7/14/2022 4:24:15 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1999
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. The Urban Runoff Clean Water Program requires that all runoff be treated to remove <br />sediment and water borne pollutants prior to discharge into a public facility. If <br />filtration -type catch basins are used, the CC&Rs shall specify the responsibility of the <br />Homeowners' Association to regularly inspect and maintain the filtration systems. <br />Such inspection and maintenance shall include replacing the inlet filters a minimum of <br />two times each calendar year. <br />9. All on -site storm drain inlets must be labeled "No dumping — Drains to Bay" or equivalent <br />using methods approved by the City or County. All on -site storm drains must be cleaned <br />at least twice a year and immediately prior to the rainy season. Additional cleaning may <br />be required by the City Engineer. <br />E. WATER SYSTEM <br />1. Prior to approval of the first Final Map for the project, the Subdivider shall submit <br />signed agreements with EBMUD for the construction of the proposed water main <br />connections. <br />2. Prior to issuance of the first building permit, all proposed water main construction and <br />improvements in Fremont Avenue and Chapman Road, should be completed, unless <br />other fire fighting measures, acceptable to the Fire Marshal, are made available on site <br />during construction. <br />3. On site EBMUD street fire hydrants with minimum fire flow and spacing in accordance <br />with the San Leandro Uniform Code will be required. Prior to installation, the Fire <br />Department shall approve the location of the fire hydrants. A water supply shall be in <br />place prior to combustible material being moved into any phase of the project. <br />F. SANITARY SEWER SYSTEM <br />1. Sanitary sewer service to the project is proposed by connections to Oro Loma facilities <br />and City maintained facilities flowing into the Oro Loma System. Prior to the approval of <br />the first Final Map, the Subdivider shall submit a copy of the signed agreement with Oro <br />Loma for the proposed sanitary sewer connection. In addition, the Subdivider shall <br />evaluate the capacity of the existing City maintained facilities effected by the increased <br />flows from the project site. The evaluation shall identify any capacity deficiencies and <br />required improvements to meet the needs of the project. All required improvements are <br />subject to the review and approval of the City Engineer and shall be constructed as part of <br />the Subdivision improvements. <br />2. The Subdivider shall install manhole(s) at the point(s) of connection of private sewers to <br />public sewers to clearly demarcate maintenance responsibilities. <br />Chapman Place <br />Vesting TM 7092 & 7093 <br />6/04/99 Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.