Laserfiche WebLink
XV.PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and each <br />page of construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br />and Signature of Registered Professional with report/design responsibility" as per sample below. <br />Exhibit D Page 7 of 7 <br />6/12/95 Word 6.0 <br />J:\WPD\FORMS\AGRE\EXHIBITC.DOC <br />