Laserfiche WebLink
00 <br />City of San Leandro Traffic Management System <br />Phase 2 Design and Construction Services <br />Hour and Fee Estimate by Task <br />Staff <br />Role <br />Rate 3 <br />Task <br />Total <br />1 <br />2 <br />3 <br />4' <br />S 2 <br />6 <br />R. Sauve <br />Principal <br />$150 <br />2 <br />2 <br />2 <br />0 <br />0 <br />0 <br />6 <br />K. Aguigui <br />Project Manager <br />$115 <br />40 <br />40 <br />67 <br />8 <br />0 <br />16 <br />171 <br />C. Long <br />Project Engineer <br />$65 <br />160 <br />220 <br />145 <br />8 <br />0 <br />58 <br />591 <br />O. Chiu <br />Assistant Engineer <br />$65 <br />38 <br />8 <br />0 <br />0 <br />0 <br />8 <br />54 <br />R. Sage <br />CAD Technician <br />$60 <br />40 <br />160 <br />32 <br />0 <br />0 <br />78 <br />310 <br />A. Remnek <br />Technician <br />$50 <br />24 <br />8 <br />0 <br />0 <br />0 <br />0 <br />32 <br />S. Bolton <br />Document Processor <br />$60 <br />0 <br />8 <br />12 <br />0 <br />0 <br />0 <br />20 <br />W. Tighe <br />Gardner Trans. <br />$144.3 <br />12 <br />4 <br />8 <br />50 <br />0 <br />6 <br />80 <br />D. VanDillen <br />Gardner Trans. <br />$86.4 <br />0 <br />0 <br />0 <br />40 <br />0 <br />0 <br />40 <br />Total Hours <br />316 <br />450 <br />266 <br />106 <br />0 <br />166 <br />1304 <br />Other Direct Costs <br />$150 <br />$3,500 <br />$225 <br />$50 <br />$95,000 <br />$50 <br />TOTALS <br />$23,251 <br />$34,277 <br />$21,449 <br />$12,159 <br />$95,000 <br />$11,726 <br />$197,862 <br />1. A majority this task to be conducted by Gardner Transportation Systems. <br />2. All of this task to be conducted by Gardner Transportation Systems and Econolite. <br />3. The rates listed are effective through July 31, 1998 for the present subconsultant and DKS grades of the persons listed. In the event DKS's personnel <br />or grades are changed. DKS shall notify the City of San Leandro in writing, and DKS shall not increase the total compensation for Basic Services <br />which shall remain at $197,862. <br />DKS Associates <br />February 26, 1998 <br />