Laserfiche WebLink
PROFESSIONAL SEAL. Where applicable in the determination of the contract administrator, the first <br />page of a technical report, first page of design specifications, and each page of construction drawings <br />shall be stamped/sealed and signed by the licensed professional responsible for the report/design <br />preparation. The stamp/seal shall be in a block entitled "Seal and Signature of Registered Professional <br />with report/design responsibility" as per sample below. <br />Seal and Signature of Registered Professional with <br />report/design responsibility <br />Agreement Page 18 of 18 <br />3/7/94 Rev. <br />