My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1998-051 to 055
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1998
>
Reso 1998-051 to 055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 4:52:37 PM
Creation date
7/14/2022 4:51:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. NOT USED <br />20. NOT USED <br />21. NOT USED <br />22. No. 2 Water System <br />II. SCOPE OF WORK <br />The work shall include all items as specified herein. <br />• Phase 4 Construction Support shall consist of providing technical services during the physical <br />construction of the work shown in the contract documents. <br />Below is a detailed description of the tasks which are included in this remaining phase. The Contractor <br />shall perform and complete these tasks in accordance with the City's requirements. <br />PHASE 4. CONSTRUCTION ADMINISTRATION AND SUPPORT <br />1. Technical Services as follows: <br />a. Consultation - The Contractor shall make visits to the project sites to review work <br />for conformance to the contract documents; issue written surveillance reports to the <br />City; provide additional drawings for items needing clarification as required; and <br />provide assistance in the interpretation of contract documents and preparation of <br />contract change orders. <br />b. Shop Drawings - The Contractor shall review shop drawings and submittals for <br />approval and conformance to the construction documents. Contractor shall stamp <br />each submittal, indicating their approval or rejection. <br />C. Final Inspection - The Contractor shall prepare a punch list of items requiring <br />repair or replacement (deficiency report) prior to final inspection and participate in a <br />final inspection once notified by the construction contractor that the punch list items <br />have been rectified. <br />d. Record Drawings - The Contractor shall prepare record drawings based on <br />Contractor's mark-ups. <br />Exhibit A Page 3 of 3 <br />3/7/94 Rev. <br />
The URL can be used to link to this page
Your browser does not support the video tag.