My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1997-131 to 135
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1997
>
Reso 1997-131 to 135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 5:12:22 PM
Creation date
7/14/2022 5:07:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1997
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3.2 The following deliverables shall also be provided: <br />A) Feature Compilation of Street Names. <br />B) Feature Compilation of all Street Center Lines. <br />C) Feature compilation of Street edge -of -pavement or edge -of -curb. <br />D) Feature compilation of Building foot prints. <br />E) One (1) set of 1 "= 100' orthophoto maps on heavy weight mylar, including an index <br />sheet showing relationship and location of all sheets, on City title block. Pages to be 24" x <br />36". Street names shall be integrated into the maps. Maps shall be suitable for running <br />blueprints. A sample sheet shall be provided, and approved by the City, prior to production <br />of the complete set. <br />F) One (1) set of 1" = 200" orthophoto maps on heavy weight mylar, including an index <br />sheet showing relationship and location of all sheets, on City title block. Pages to be 24" x <br />36". Street names shall be integrated into the maps. Maps shall be suitable for running <br />blueprints. A sample sheet shall be provided, and approved by the City, prior to production <br />of the complete set. <br />PROJECT SCHEDULE <br />October 6, 1997 Council award contract <br />October 6 -10, 1997 Meet with staff to review tile layout, ground control and schedule for <br />flying <br />November 1, 1997 Aerial photography completed <br />December 19, 1997 Installation of additional disk storage and trial completed of 30 <br />tiles/photos including plotting <br />January 15, 1998 All Digital Orthophotographs delivered and operational on City <br />System <br />January 30, 1998 All feature compilations delivered and operational <br />January, 1998 Project completed, all deliverables received by City, including <br />installation of all hardware and software <br />Note: Trial of plotting software to be performed prior to December 19, 1997. Software training <br />can occur after this date, but prior to January 15, 1998. <br />This schedule shows the aerials to be flown in October, 1997. If adverse weather conditions <br />prevent the aerials from being flown in October, the aerials shall be flown in Spring 1998, at a <br />mutually acceptable time. The remainder of the schedule shall be adjusted as appropriate. <br />Exhibit A Page 4 of 4 <br />1/10/90 Rev. <br />
The URL can be used to link to this page
Your browser does not support the video tag.