Laserfiche WebLink
3.3.2 The following deliverables shall also be provided: <br />A) Feature Compilation of Street Names. <br />B) Feature Compilation of all Street Center Lines. <br />C) Feature compilation of Street edge -of -pavement or edge -of -curb. <br />D) Feature compilation of Building foot prints. <br />E) One (1) set of 1 "= 100' orthophoto maps on heavy weight mylar, including an index <br />sheet showing relationship and location of all sheets, on City title block. Pages to be 24" x <br />36". Street names shall be integrated into the maps. Maps shall be suitable for running <br />blueprints. A sample sheet shall be provided, and approved by the City, prior to production <br />of the complete set. <br />F) One (1) set of 1" = 200" orthophoto maps on heavy weight mylar, including an index <br />sheet showing relationship and location of all sheets, on City title block. Pages to be 24" x <br />36". Street names shall be integrated into the maps. Maps shall be suitable for running <br />blueprints. A sample sheet shall be provided, and approved by the City, prior to production <br />of the complete set. <br />PROJECT SCHEDULE <br />October 6, 1997 Council award contract <br />October 6 -10, 1997 Meet with staff to review tile layout, ground control and schedule for <br />flying <br />November 1, 1997 Aerial photography completed <br />December 19, 1997 Installation of additional disk storage and trial completed of 30 <br />tiles/photos including plotting <br />January 15, 1998 All Digital Orthophotographs delivered and operational on City <br />System <br />January 30, 1998 All feature compilations delivered and operational <br />January, 1998 Project completed, all deliverables received by City, including <br />installation of all hardware and software <br />Note: Trial of plotting software to be performed prior to December 19, 1997. Software training <br />can occur after this date, but prior to January 15, 1998. <br />This schedule shows the aerials to be flown in October, 1997. If adverse weather conditions <br />prevent the aerials from being flown in October, the aerials shall be flown in Spring 1998, at a <br />mutually acceptable time. The remainder of the schedule shall be adjusted as appropriate. <br />Exhibit A Page 4 of 4 <br />1/10/90 Rev. <br />