Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />12.6.100: BUILDING. <br />(a) Building Permit The fee for a building permit shall include an issuance fee of $22.00 plus the fee <br />based on total valuation of the building or structure in accordance with the following table: <br />Building Permits requiring more than one inspection, other than those requiring return inspections <br />for corrections from a previous inspection, shall have a minimum permit fee of $106.00. The <br />minimum fee for one inspection is $48.00. <br />For work involving a combination of Building and/or mechanical, electrical, and plumbing, with <br />a value of less than $3, 000, an all-inclusive permit may be issued with one issuance fee, one <br />permit fee, plus the items from the respective fee tables. The Building Official may adjust the <br />plan checking/permit fee for an individual project when costs to the City are not congruent with <br />this fee schedule. <br />TOTAL VALUATION* <br />FROM <br />$1.00 <br />$501.00 <br />$2,001.00 <br />$ 50,001.00 <br />TO & INCLUDING <br />$500.00 <br />FEE <br />$48.00 <br />$2,000.00 $48.00 for the first $500 plus $5.50 for each <br />additional $100 or fraction thereof, to and <br />including $2,000. <br />$50,000.00 $130.00 for the first $2,000 plus $10.75 for each <br />additional $1,000 or fraction thereof, to and <br />including $50,000. <br />$100,000.00 $646.50 for the first $50,000 plus $7.50 for each <br />add. $1,000 or fraction thereof, to and including <br />$100,000. <br />* Based on total value of all construction work, as determined by the Building Official, including all finish work, <br />roofing, electrical, plumbing, heating, air conditioning, elevators, fire -extinguishing systems and any other <br />permanent equipment. <br />04-07-97 1 Building Code <br />