Laserfiche WebLink
Shoreline CAC Page 12 <br />February 25, 2009 <br />Meeting Highlights <br />enterprises with the intent that the costs of providing the goods or services are <br />recovered primarily through user charges. <br />• The City's Shoreline Enterprise Fund has three divisions: Golf Course, Boat <br />Harbor; and Shoreline (includes Marina Park, hotel and restaurants.) <br />• In the Fiscal Year 2007-08, the Golf Course and the Shoreline operated with <br />profits of $457,000 and 269,000, respectively. The harbor operations <br />operated at a loss of $874,000; thus the Fund (cumulative of the three <br />divisions) operated at a loss of $148,000. <br />• In addition, there are significant debt balances as of June 30, 2009. The Golf <br />Course Division owes the General Fund $4.2 million, while the Harbor <br />Operations Division owes the General Fund $3.3 million for dredging and <br />owes $3 million in CalBoat loans. <br />Discussion ensued regarding the following: <br />• Under Harbor Operations Division Expenditures: What are Interfund <br />charges? These are overhead costs for maintenance, vehicles, information <br />technology, insurance, etc. <br />• What are CIP Charges? Those are engineering costs that are billed hourly <br />for work on the repair of shoreline facilities and structures. <br />• What are Services? Those are costs relating to advertising, marketing, and <br />landscaping. <br />• What is DBW? State of California Department of Boating and Waterworks. <br />• Is it the City's plan for the Shoreline Enterprise Fund to operate at a profit? <br />The City's near —term plan is to operate to break-even. The City would like to <br />identify revenues so that any future development can pay for itself. The City <br />is not in a position to subsidize development of the Shoreline. <br />C. Future of the Boat Harbor. Director Bakaldin gave a powerpoint presentation <br />which gave an overview of the San Leandro Marina Shoreline Area. <br />• The harbor includes the marina office, docks, restrooms, fuel dock, boat <br />launch, Spinnaker Yacht Club and San Leandro Yacht Club <br />• The harbor opened in 1963; the harbor expanded in 1972, and the concrete <br />docks were constructed in 1991. <br />• There are approximately 460 berths (260 concrete and 200 wooden berths.) <br />• Occupancy of the harbor is currently at 40% capacity <br />• Siltation in the harbor and fuel dock is driving out larger boats. <br />• Marina operations revenues continue to drop. <br />• Tides and siltation are a natural process in the Bay that continues to build up <br />deposits in the harbor and the channel making them shallower for large <br />boats to maneuver. <br />• Full dredging is cost prohibitive. <br />• A less costly partial dredge to a five foot depth was approved by the City <br />Council in December 2008 to take advantage of Federal funding to dredge <br />the Channel. <br />