My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Bay Area Tree Specialist 07152022
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
NPSA Bay Area Tree Specialist 07152022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 12:36:51 PM
Creation date
8/9/2022 12:36:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/15/2022
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Non-Professional Services Agreement between July 15, 2022 <br />City of San Leandro and Bay Area Tree Specialists—Exhibit A Page 3 of 7 <br />work so as not to interfere with or hinder the progress or completion of the work being <br />performed by other contractors. Contractors working on the same project shall cooperate with <br />each other as directed. Each contractor involved shall assume all liability, financial or <br />otherwise, in connection with their contract and shall protect and save harmless the City from all <br />damages or claims that may arise because of inconvenience, delays, or loss experienced by <br />them because of the presence and operations of other contractors working within the limits of <br />the same project. <br />DAMAGE: The contractor shall be held responsible for any breakage, loss of the City’s <br />equipment or supplies through negligence of the contractor or their employee while working on <br />the City’s premises. The contractor shall be responsible for restoring or replacing any <br />equipment, facilities, etc. so damaged. The contractor shall immediately report to the City any <br />damages to the premises resulting from services performed under their contract. Failure or <br />refusal to restore or replace such damaged property will be a breach of their contract. <br />DAYS OF WORK. All work shall be done Monday through Friday between the hours of 7:00 <br />a.m. to 4:00 p.m. excluding designated City holidays, unless otherwise directed by a City official. <br />The following are the designated City holidays: <br />January 1 (New Year’s Day) <br />The third Monday in January (Martin Luther King’s Birthday) <br />The second Monday in February (Lincoln’s Birthday) <br />The third Monday in February (Washington’s Birthday) <br />March 31 (Cesar Chavez Day) <br />The last Monday in May (Memorial Day) <br />June 19 (Juneteenth) <br />July 4 (Independence Day) <br />The first Monday in September (Labor Day) <br />November 11 (Veterans’ Day). <br />The fourth Thursday in November (Thanksgiving Day) <br />The day after Thanksgiving Day <br />December 24 (Christmas Eve) <br />December 25 (Christmas Day) <br />December 31 (New Year’s Eve) <br /> <br />EXAMINATION OF SPECIFICATION AND SITE: Contractor is expected to carefully examine <br />the site of the proposed work and all project specifications, documents, and forms. They shall <br />satisfy themselves as to the character, quality, and quantities of work to be performed, materials <br />to be furnished and the requirements of the proposed specifications. <br />INSURANCE REQUIREMENTS: Within twelve (12) consecutive calendar days of award of <br />contract, Contractor must furnish the City with the Certificates of Insurance proving coverage as <br />specified in Insurance Requirements. Additional information about the insurance requirements <br />may be found in Section 4 of the Non-Professional Services Agreement. <br />LAWS – ADHERENCE TO ALL LOCAL, STATE, AND FEDERAL LAWS AND <br />REQUIREMENTS: The contractor shall adhere to all applicable health and safety laws and <br />regulations. Safety Requirements are provided in Section 3.1 of the Non-Professional Services <br />Agreement. <br />LIQUIDATED DAMAGES: Time is of the essence of the contract. Failure to start and complete <br />all work specified within the time allowed shall constitute material breach of contract. The “time <br />allowed” will be calculated from the date of the Notice to Proceed through the “Maximum <br />DocuSign Envelope ID: 730FF401-75FC-4A66-8732-81D3E3ACF760
The URL can be used to link to this page
Your browser does not support the video tag.