Laserfiche WebLink
Davis Street and Carpentier Street Pedestrian Hybrid Beacon Project, Project No. 2016.0550 <br /> <br />Change Order 2 Cost – Labor $ 8,071.68 <br /> Equipment $ 4,348.32 <br /> Material $27,577.00 <br /> Total $39,997.00 <br /> <br /> <br />Change Order 3 Cost – CMS Boards Rental and Installation $6,981.72 <br /> Sewer Lateral Fix at 501 Davis St. $10,697.67 <br /> Signage Credit ($ 574.96) <br /> Total $17,104.43 <br /> <br /> <br /> <br />