Laserfiche WebLink
<br />Legal Services Agreement between City of San Leandro and Last revised 12/01/2021 <br />Allen, Glaessner, Hazelwood, & Werth for Legal Representation Page 15 of 17 <br />10.9 Contract Administration. This Agreement shall be administered by <br />Richard D. Pio Roda ("Contract Administrator"). All correspondence shall <br />be directed to or through the Contract Administrator or his or her <br />designee. <br /> <br />10.10 Notices. Any written notice to Attorney shall be sent to: <br /> <br /> Patrick Moriarty <br />Allen, Glaessner, Hazelwood, and Werth <br />180 Montgomery Street, Ste 1200 <br />San Francisco, CA 94104 <br />Email: pmoriarty@aghwlaw.com <br /> <br /> <br /> <br />Any written notice to City shall be sent to: <br /> <br /> Richard D. Pio Roda <br /> City Attorney, San Leandro <br /> <br />With a copy to: <br />City of San Leandro <br />c/o Risk Management <br />835 East 14th Street <br />San Leandro, CA 94577 <br /> <br /> <br /> <br />10.11 Professional Seal. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design <br />specifications, and each page of construction drawings shall be <br />stamped/sealed and signed by the licensed professional responsible for <br />the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design <br />responsibility," as in the following example. <br /> <br /> <br /> <br /> <br /> <br />_____________________________________ <br />____ <br />Seal and Signature of Registered Professional <br />with report/design responsibility. <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 659DF64A-47CB-44D0-B5E7-1900E5D5ABF8