Laserfiche WebLink
  <br />  <br /> CITY OF SAN LEANDRO | BUILDING AND SAFETY SERVICES 1-2 <br /> <br />  <br />SCOPE OF SERVICES, COMPENSATION SCHEDULE AND REIMBURSABLE EXPENSES <br /> <br />In general, plan review turnaround timeframe is ten (10) business days for initial reviews and five (5) business days for rechecks <br />and revisions. Timeframes for large-size projects will be confirmed with the City staff prior to proceeding with the review. <br />All corrections are identified based on compliance with specified codes and regulations and worded so the designer will know <br />what needs attention and how to respond to the issue stated. Generally, corrections are identified in two ways: <br /> Notes can be made on plans as appropriate and authorized to assist in locating the issue on the plans. <br /> A correction sheet is generated detailing what items need to be addressed before plans can be approved. <br /> <br />The client will receive a copy of each correction list, as well as a cover memo containing the following: <br /> The date plans were reviewed by TRB and Associates. <br /> The date that the applicant/applicant’s designee was notified that the plan review was completed. <br /> <br />Step 3 – Transmittal of Plans and Comment Lists for Plan Review: <br />At the heart of our approach in delivering our services to you, is the recognition that there must be a coordinated effort to track <br />and coordinate all submittals and requests received. To help assure that submittals are properly coordinated and tracked, TRB <br />and Associates has established an internal plan review coordination process to ensure that each plan received for review is <br />properly handled, processed, and returned on time. Our plan tracking procedures are computerized to track each submittal <br />through the review process and maintain accurate and comprehensive records for each submittal. <br />Upon completion of our review, any comments generated are consolidated into a correction letter which is forwarded to the <br />applicant; at the same time, an electronic copy is sent to the City for its reference. <br />Step 4 – Rechecks: <br />Upon receipt of the resubmittal package from the applicant, we will notify the City (via email) that we have received the package. <br />Once we have verified that the resubmittal package is complete, we perform a recheck in the agreed-upon timeframe. This <br />process is repeated until the project plan documents are ready to be recommended for approval. <br />Step 5 – Plan Approval: <br />When all review comments are satisfied, we will forward two sets of all relevant correspondence bearing our company’s “Reviewed <br />for Code Compliance” stamp (including plans, calculations, and specifications), along with a transmittal letter indicating our <br />recommendation for project approval, and the project file to the City for processing. <br /> <br />Shipping and Delivery of Plans <br /> <br />TRB provides pre-printed overnight shipping labels and/or pickup services to facilitate the transport of plan submittals to our <br />office. Please note that the pickup, shipment and delivery of plan documents and other relevant correspondence to the City is <br />provided at no additional cost to the City. <br /> <br /> <br /> <br />Building Code Consultation and Code Instruction <br /> <br />TRB is prepared to offer general Building Code Consultation and Code Instruction support to the City and a range of technical <br />subjects. Our staff includes subject-matter experts and award-winning instructors in construction code compliance. Of note, <br />our team members are currently providing extensive training on the 2019 California Building and Residential Codes to TRB <br />clients, local ICC Chapters, and CALBO Education Week attendees. <br /> <br />DocuSign Envelope ID: 87BA04F8-702A-4A32-8700-ADF524CA9BD6DocuSign Envelope ID: 92FE33CE-3752-40DD-B011-BB2283F81E11