My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Nichol Consulting Engineers 06012022 (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
CSA Nichol Consulting Engineers 06012022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2022 1:25:59 PM
Creation date
9/26/2022 1:25:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/1/2022
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and March 22, 2022 <br />NCE for Annual Street Paving 21-23 Exhibit A – Page 10 of 11 <br />reviewing Contractor submittals (particularly mix design and materials), responding to Contractor requests <br />for information (RFI), providing recommendations for any necessary construction changes due to <br />unforeseen field conditions, assisting with the review and preparation of Contract Change Orders, final <br />processing with Caltrans to secure encroachment permits for construction, and field review of construction <br />for acceptance and identification of punch-list items. Consultant shall also visit the site upon substantial <br />completion and prepared punchlist listing corrective items as needed. <br /> <br />Schedule: <br />Time is important on this project, and the schedule below outlines the expectations for completion the <br />project deliverables. These completion dates are based relative to the issuance of the Notice to Proceed <br />(NTP) by the City. <br /> <br /> Completion Date <br />Deliverable (Weeks after NTP) <br />Preliminary Field Review, 8 <br />Utility Map requests / Notifications, and <br />Final Street List <br />Pavement Recommendations Matrix 14 <br />(Rehabilitation Streets) <br />Sanitary Sewer Defect Review and Identification 18 <br />Surface Seal PS&E <br />30% / 70%/ 100% 12 / 24 / 36 <br />Topographic Survey and <br />Utility Locating 18 <br />Rehabilitation PS&E <br />30% / 70%/ 100% 22 / 33 / 48 <br /> <br />Upon completion of the Preliminary Field Review and Final Street List, Consultant shall confirm schedule <br />for completion of all project PS&E tasks for City review and approval. Consultant shall assume that the City <br />will provide written responses on progress submittals within 21 days of receipt. The City and Consultant <br />will work cooperatively to try and meet the following project schedule: <br />o City goal to issue NTP in April 2022 <br />o Consultant goal to complete SS Point Repairs Design by the end of September 2022. <br />o Consultant goal to complete Final IFB Surface Seal PS&E by the first week of January 2023. <br />o Consultant goal to complete Final IFB Rehab PS&E by the end of March 2023. <br /> <br />Format: <br />• Consultant will provide a written response for all City comments on submittals and meet with the <br />City to review responses and agree on revisions to be included in subsequent submittals. <br />• Electronic files for all above deliverables are to be in adobe PDF, as well as original program files <br />from AutoCAD 2022, MS Word, and MS Excel. <br />• All final bid documents submittals will be reviewed, stamped and signed by Consultant’s California <br />licensed profession engineer of record, and original copies delivered to the City in both hard copy <br />and electronic formats. Permit submittals shall be similarly signed as required by the agency. <br />DocuSign Envelope ID: DCD04F48-8A5B-4F32-9A2F-91EC4E276E20
The URL can be used to link to this page
Your browser does not support the video tag.