Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and March 22, 2022 <br />NCE for Annual Street Paving 21-23 Exhibit B – Page 2 of 2 <br />SCHEDULE OF CHARGES 2022 <br /> <br />PROFESSIONAL SERVICES <br /> <br /> <br /> <br /> <br />TECHNICAL SERVICES <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CONTRACT LABOR <br /> <br /> <br /> <br />LITIGATION SUPPORT <br /> <br /> <br />EQUIPMENT <br /> <br /> <br /> <br /> <br /> <br />OUTSIDE SERVICES <br /> <br /> <br /> <br />COMMUNICATION/ <br />REPRODUCTION <br /> <br /> <br /> Principal .......................................................................$285/hour <br />Associate......................................................................$225/hour <br />Senior ........................................................................$195/hour <br />Project .........................................................................$170/hour <br />Staff ............................................................................$150/hour <br /> <br />Senior Construction Manager* ........................$150/($170-PW)/hour <br />Senior Designer.............................................................$160/hour <br />CADD Designer .............................................................$140/hour <br />Senior Technician* ........................................$125/($150-PW)/hour <br />Construction Inspector* .................................$130/($155-PW)/hour <br />CAD Technician .............................................................$125/hour <br />Senior Field Scientist......................................................$130/hour <br />Field Scientist ...............................................................$105/hour <br />Project Administrator .....................................................$110/hour <br />Field/Engineering Technician* ..........................$105/($125-PW)hour <br />Technical Editor.............................................................$105/hour <br />Clerical ..........................................................................$90/hour <br /> <br />From time to time, NCE retains outside professional and technical labor <br />on a temporary basis to meet peak workload demands. Such contract <br />labor will be charged at regular Schedule charges. <br /> <br />Engineer/Scientist .........................................................$330/hour <br />Court Appearances & Depositions ....................................$550/hour <br /> <br />Plotter Usage ..............................................(separate fee schedule) <br />Truck ............................................................................$100/day <br />Automobile....................................IRS Standard Mileage Rate+15% <br />Falling Weight Deflectometer Testing..............................$4,000/Day <br />Coring........................................................................$5,000/Day <br />Environmental Equipment.............................(separate fee schedule) <br /> <br />Rental of equipment not ordinarily furnished by NCE and all other costs <br />such as special printing, photographic work, travel by common carrier, <br />subsistence, subcontractors, etc. ...................................cost + 10% <br /> <br /> <br />In-house costs for postage, printing, and copying <br />................................Related staff labor plus non- labor charges x 5% <br />*A surcharge of $25/hour applied for technicians and construction <br />inspectors to comply with Prevailing Wage (PW) per requirements of <br />California Department of Industrial Relation <br />DocuSign Envelope ID: DCD04F48-8A5B-4F32-9A2F-91EC4E276E20