Laserfiche WebLink
EXHIBIT A <br />ENGINEER'S ESTIMATE <br />FOR <br />STREET IMPROVEMENTS <br />1348-1364 ORCHARD AVE. <br />Item <br />Unit <br />No. <br />Item <br />Quantity <br />Price <br />Amount <br />1. <br />Clearing <br />& Grubbing <br />Lump Sum <br />$750.00 <br />$ 750.00 <br />2. <br />Sidewalk <br />Including AB <br />456 s.f. <br />3.00 <br />1,368.00 <br />3. <br />Curb & Gutter <br />100 l.f. <br />13.00 <br />1,300.00 <br />4. <br />Driveway <br />Including AB <br />144 s.f. <br />3.75 <br />540.00 <br />5. <br />Asphalt <br />Concrete <br />12 tons <br />50.00 <br />600.00 <br />Total - Items 1 thru 5 $4,558.00 <br />Contingencies 442.00 <br />Total Contractual Cost 5,000.00 <br />Surveys & Plans 250.00 <br />Construction Engr. 250.00 <br />TOTAL COST OF JOB $5,500.00 <br />Approved: <br />urtis M. Luck, City Engineer <br />This estimate is for a 2 foot curb set- <br />back over a 100 foot length. Curb and <br />sidewalk width is 6.5 feet. Street <br />structural section is .80' AC. <br />Prepared By: JSN <br />Typed By: alc <br />Date: 3/7/85 <br />