My WebLink
|
Help
|
About
|
Sign Out
Home
10K Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 10172022
>
10K Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 1:31:34 PM
Creation date
10/13/2022 1:31:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
10/17/2022
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. A receptacle labeled “Electric Vehicle Outlet” or electric vehicle supply <br />equipment located within three (3) feet of the parking space. If EVSE is <br />provided the minimum capacity of the EVSE shall be 16-ampere. <br />iii. Conduit oversized to accommodate future Level 2 EV Ready (208/240 volt, 40- <br />ampere) at each parking space. <br /> <br />LEVEL 2 EV CAPABLE. A parking space provided with electrical infrastructure that meets the <br />following requirements: <br /> <br />i. Conduit that links a listed electrical panel with sufficient capacity to a junction <br />box or receptacle located within three (3) feet of the parking space. <br />ii. The conduit shall be designed to accommodate at least 8.3 kVa (208/240 volt, <br />40-ampere) per parking space. Conduit shall have a minimum nominal trade <br />size of 1 inch diameter and may be sized for multiple circuits as allowed by the <br />California Electrical Code. Conduit shall be installed at a minimum in spaces that <br />will be inaccessible after construction, either trenched underground or where <br />penetrations to walls, floors, or other partitions would otherwise be required <br />for future installation of branch circuits, and such additional elements deemed <br />necessary by the Building Official. Construction documents shall indicate future <br />completion of conduit from the panel to the parking space, via the installed <br />inaccessible conduit. <br />iii. The electrical panel shall reserve a space for a 40-ampere overcurrent <br />protective device space(s) for EV charging, labeled in the panel directory as “EV <br />CAPABLE.” <br />iv. Electrical load calculations shall demonstrate that the electrical panel service <br />capacity and electrical system, including any on-site distribution transformer(s), <br />have sufficient capacity to simultaneously charge all EVs at all required EV <br />spaces at a minimum of 40 amperes. <br />v. The parking space shall contain signage with at least a 12” font adjacent to the <br />parking space indicating the space is EV Capable. <br /> <br />LEVEL 2 EV READY. A parking space that is served by a complete electric circuit with the <br />following requirements: <br /> <br />i. A minimum of 8.3 kVa (208/240 volt, 40-ampere) capacity wiring. <br />ii. A receptacle labeled “Electric Vehicle Outlet” or electric vehicle supply <br />equipment located within three (3) feet of the parking space. If EVSE is <br />provided the minimum capacity of the EVSE shall be 30-ampere. <br /> <br />LOW POWER LEVEL 2 EV READY. A parking space that is served by a complete electric <br />circuit with the following requirements: <br /> <br />i. A minimum of 4.1 kVA (208/240 Volt, 20-ampere) capacity wiring. <br />ii. A receptacle labeled “Electric Vehicle Outlet” or electric vehicle supply <br />equipment located within three (3) feet of the parking space. If EVSE is <br />provided the minimum capacity of the EVSE shall be 16-ampere.
The URL can be used to link to this page
Your browser does not support the video tag.