Laserfiche WebLink
5.04 <br />4.13$ 1,800 SF 7,425$ <br />13.39$ 300 LF 4,017$ <br />36,227$ <br />22.01 <br />30 36,227$ %10,868$ <br />22.03 <br />25 36,227$ %9,057$ <br />22.17 <br />70 36,227$ %25,359$ <br />81,511$ <br />81,511$ <br />Proposal Price Based Upon Market Experience:65,944$ <br />Garland/DBS Price Based Upon Local Market Competition: <br />1 Waterproofing Associates <br />2 Western Roofing Services <br />3 San Francisco Roofing Services <br />MULTIPLIER - MULTIPLE MATERIAL STAGINGS <br />Multiplier is applied when labor production is effected <br />by the time it takes to stage a roof multiple times. <br />Situations include, but are not limited to staging <br />materials to perform work on multiple roof levels, <br />planned shutdowns and restarts, portion of the job is <br />over sensitive work areas requiring staging from more <br />than one point, etc. <br />80,268$ <br />MULTIPLIER - ROOF SIZE IS GREATER THAN <br />1,000 SF, BUT LESS THAN 2,000 SF <br />Multiplier is applied when Roof Size is greater than <br />1,000 SF, but less than 2,000 SF. Situation creates <br />the fixed costs: equipment, mobilization, <br />demobilization, disposal, & set-up labor to be allocated <br />across a very small roof area resulting in fixed costs <br />having a significant impact on the overall job costs <br />Total After Multipliers <br />Base Bid Total Maximum Price of Line Items under the MICPA: <br />65,944$ <br />77,665$ <br />Coat New Roofing With Elastomeric Coating: ROOF <br />SYSTEM TYPE <br />Apply a bright white, water-based, acrylic-urethane <br />hybrid roof coating per Specifications (1.0 Gallon per <br />Square per Coat - 2 Coats Required) - Smooth- <br />Surfaced Modified Roof <br />Gutter Replacement - .040 Aluminum <br />Sub Total Prior to Multipliers <br />MULTIPLIER - DIFFICULT ROOF OR BUILDING <br />ACCESS <br />Multiplier is applied when labor production is effected <br />by roof or building access. Situations that can cause <br />roof access to be more difficult include, but are not <br />limited to: no access for lifts or cranes, access is <br />dependent upon road closure, access point requires <br />the closure of a building entrance, roof level is not <br />accessible from the ground, roof area is interior to <br />adjacent roofs or roof materials and materials and <br />equipment must be loaded to one roof area and <br />carried to another roof area, roof materials and <br />equipment must be carried to the roof through an <br />interior building access point, no or limited staging <br />areas on the ground, etc. <br />Page 5 of 6