My WebLink
|
Help
|
About
|
Sign Out
Home
12A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 11072022
>
12A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 2:24:41 PM
Creation date
11/10/2022 12:50:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/7/2022
Retention
PERM
Document Relationships
Ord 2022-014 Building Code Update
(Amended)
Path:
\City Clerk\City Council\Ordinances\2022
Reso 2022-230 Building Code Standards and Reach Codes
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i. A minimum of 48 kVa (480 volt, 100-ampere) capacity wiring. <br />ii. Electric vehicle supply equipment (EVSE) located within three (3) feet of the <br />parking space providing a minimum capacity of 80-ampere. <br /> <br />ELECTRIC HEATING APPLIANCE. A device that produces heat energy to create a <br />warm environment by the application of electric power to resistance elements, refrigerant <br />compressors, or dissimilar material junctions, as defined in the California Mechanical <br />Code. <br /> <br />ELECTRIC VEHICLE CHARGING STATION (EVCS). A parking space that <br />includes installation of electric vehicle supply equipment (EVSE) at an EV Ready space. <br />An EVCS space may be used to satisfy EV Ready space requirements. EVSE shall be <br />installed in accordance with the California Electrical Code, Article 625. <br /> <br />FUEL GAS. A gas that is natural, manufactured, liquefied petroleum, or a mixture of <br />these. <br /> <br />LEVEL 1 EV READY. A parking space that is served by a complete electric circuit with <br />the following requirements: <br /> <br />i. A minimum of 2.2 kVa (110/120 volt, 20-ampere) capacity wiring. <br />ii. A receptacle labeled “Electric Vehicle Outlet” or electric vehicle supply <br />equipment located within three (3) feet of the parking space. If EVSE is <br />provided the minimum capacity of the EVSE shall be 16-ampere. <br />iii. Conduit oversized to accommodate future Level 2 EV Ready (208/240 volt, <br />40-ampere) at each parking space. <br /> <br />LEVEL 2 EV CAPABLE. A parking space provided with electrical infrastructure that <br />meets the following requirements: <br /> <br />i. Conduit that links a listed electrical panel with sufficient capacity to a <br />junction box or receptacle located within three (3) feet of the parking space. <br />ii. The conduit shall be designed to accommodate at least 8.3 kVa (208/240 <br />volt, 40-ampere) per parking space. Conduit shall have a minimum nominal <br />trade size of 1 inch diameter and may be sized for multiple circuits as <br />allowed by the California Electrical Code. Conduit shall be installed at a <br />minimum in spaces that will be inaccessible after construction, either <br />trenched underground or where penetrations to walls, floors, or other <br />partitions would otherwise be required for future installation of branch <br />circuits, and such additional elements deemed necessary by the Building <br />Official. Construction documents shall indicate future completion of conduit <br />from the panel to the parking space, via the installed inaccessible conduit. <br />iii. The electrical panel shall reserve a space for a 40-ampere overcurrent <br />protective device space(s) for EV charging, labeled in the panel directory as <br />“EV CAPABLE.”
The URL can be used to link to this page
Your browser does not support the video tag.