My WebLink
|
Help
|
About
|
Sign Out
Home
12A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 11072022
>
12A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 2:24:41 PM
Creation date
11/10/2022 12:50:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/7/2022
Retention
PERM
Document Relationships
Ord 2022-014 Building Code Update
(Amended)
Path:
\City Clerk\City Council\Ordinances\2022
Reso 2022-230 Building Code Standards and Reach Codes
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Building Official is authorized to terminate such permit for a temporary structure or <br />use and to order the temporary structure or use to be discontinued. <br />SECTION 109 <br />FEES <br />109.1 Payment of fees. <br />A permit shall not be valid until the fees prescribed by law have been paid, nor shall an <br />amendment to a permit be released until the additional fee, if any, has been paid. <br />Fees shall be assessed for permits and associated plan review in accordance with the fee <br />schedule established by the San Leandro City Council as set forth in Chapter 4 of the San <br />Leandro Administrative Code. <br />109.2 Permit fees. <br />1. General: Fees shall be assessed in accordance with the provisions of this section. <br />2. Permit Fees: The fee for each permit shall be as set forth in this section. The determination <br />of value or valuation under any of the provisions of this Code shall be made by the Building <br />Official. The value to be used in computing the building permit and building plan review fees <br />shall be the total value of all construction work for which the permit is issued as well as all finish <br />work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire- <br />extinguishing systems and other permanent equipment. <br />3. Plan Review Fees: When submittal documents are required by Section 107.1, a plan review <br />shall be paid at the time of submitting the submittal documents for plan review. Said plan <br />review fee shall be eighty percent (80%) of the building permit fee as set forth in the applicable <br />fee schedule resolution adopted by the City Council. <br /> The plan review fees specified in this subsection are separate fees from the permit fees <br />specified in Section 108.2(b) and are in addition to the permit fees. <br /> When submittal documents are incomplete or changed so as to require additional plan <br />review or when the project involves deferred submittal items as defined in Section 107.3.4.2, <br />an additional plan review fee shall be charged at the rate shown in the fee schedule. <br />4. Expiration of Plan Review: Applications for which no permit is issued within one hundred <br />eighty (180) days following the date of application shall expire by limitation and plans and other <br />data submitted for review may thereafter be returned to the applicant or destroyed by the <br />Building Official. The Building Official may grant one or more extensions of time for additional
The URL can be used to link to this page
Your browser does not support the video tag.