My WebLink
|
Help
|
About
|
Sign Out
Home
East Bay Dischargers Authority 07012020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
Rick's System
>
East Bay Dischargers Authority 07012020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 1:39:49 PM
Creation date
12/13/2022 1:39:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36- <br />15966623.1 <br />SCHEDULE B <br />ALLOCATION OF OPERATION AND MAINTENANCE COSTS <br />Operation and Maintenance Costs for Authority Facilities will be divided into, and allocated <br />based on, the following categories: <br />1. Fixed Costs include all Operation and Maintenance Costs not defined below as "Variable <br />Costs." The total Fixed Costs, less any amounts received by the Authority to offset Fixed <br />Costs, will be apportioned to the Agencies based on their current Maximum Flow Rate <br />Capacity (as shown in Schedule F) normalized out of 100 as follows: <br />San Leandro 13.74% <br />Oro Loma 19.44% <br />Castro Valley 10.30% <br />Hayward 14.72% <br />Union 42.10% <br />In the event one or more Agencies adjusts its Maximum Flow Rate Capacity as set forth <br />in Section 11, this schedule will be adjusted to reflect the same. <br />Notwithstanding the foregoing, San Leandro will not share in any fixed Operation and <br />Maintenance Costs for the Oro Loma Effluent Pump Station, Hayward Effluent Pump <br />Station, or Union Effluent Pump Station, nor will it share in Operation and Maintenance <br />Costs for the Transport System. <br />2. Variable Costs will be deemed to be costs of energy used for pumping, chemical costs <br />used in operation of the Facilities, and maintenance, and repair charges incurred in the <br />operation and maintenance of the system. Variable Costs will be allocated to the <br />Agencies based on total effluent flow for a one year period as set forth in Policies and <br />Procedures. Union's total effluent flow for the purposes of the calculation of Variable <br />Costs will include any flow discharged to the Hayward Marsh pursuant to the Hayward <br />Marsh MOU. <br />The volume of flow that an Agency recycles that does not utilize any Authority Facilities <br />will not be included in the effluent flow reported by the Agency for the purposes of <br />calculating Variable Costs. To the extent that recycled water is conveyed or pumped <br />using Authority Facilities, it will be included in the Agency’s reported effluent flow for <br />the purposes of calculating Variable Costs.
The URL can be used to link to this page
Your browser does not support the video tag.