Laserfiche WebLink
BID SUMMARYWashington-Chapman Railroad Crossing ImprovemBID OPENINGDATE: October 26, 2022TIME: 3:00 p.m. LOCATION: City Clerk's OfficeITEMNO.ITEM UNIT COST ITEM COSTBASE BID1 Mobilization per Section 9-3.4 1 LS $52,000.00 $52,000.002 Work Area Traffic Control per Section 6011 LS $20,000.00 $20,000.003 Remove Vertical Curb per Section 300-189 LF $15.00 $1,335.004 Remove Curb & Gutter per Section 300-175 LF $25.00 $1,875.005 Remove Concrete Sidewalk per Section 300-13,106 SF $10.00 $31,060.006 Remove Fence per Section 300-1.1 21 LF $50.00 $1,050.007 Roadway Excavation per Section 300-1 (Final Quantity)137 CY $120.00 $16,440.008 Install Decorative Cobblestone per Section 303-4.3428 SF $70.00 $29,960.009 Imported Borrow Fill per Section 300-5.3 (Final Quantity)140 CY $75.00 $10,500.0010 Install Detectable Warning Surface per Section 303-5.5.3120 SF $50.00 $6,000.0011 Install Curb & Gutter per Section 303-5.5.375 LF $110.00 $8,250.0012 Install 6” Vertical Curb per Section 303-5.5.3792 LF $65.00 $51,480.0013 Install Curb Wall per Section 303-5.5.3 55 LF $150.00 $8,250.0014 Install Sidewalk per Section 303-5.5.3 6,058 SF $35.00 $212,030.00PROJECT TITLE:PROJECT NO.:2016.0320BID NO.:22-23.001ENGINEER'S ESTIMATEDate Approved: 9/13/2022Prepared by: J. O'DriscollQUANTITYMark lee & Yong Kay, Inc. DBA BayCF Contracting, Inc.4026 Martin Luther king Jr. Way 850 South Van Ness Ave., #21Oakland, CA 94609 San Francisco, CA 94110Phone: (510) 658-7225 Phone: (415) 721-7160Fax: (510) 658-4890 Fax: (415) 296-6437UNIT COST UNIT COST$40,000.00 $40,000.00 $100,000.00 $100,000.00$80,000.00 $80,000.00 $200,000.00 $200,000.00$20.00 $1,780.00 $40.00 $3,560.00$50.00 $3,750.00 $60.00 $4,500.00$10.00 $31,060.00 $8.00 $24,848.00$100.00 $2,100.00 $200.00 $4,200.00$100.00 $13,700.00 $300.00 $41,100.00$80.00 $34,240.00 $90.00 $38,520.00$80.00 $11,200.00 $250.00 $35,000.00$100.00 $12,000.00 $75.00 $9,000.00$100.00 $7,500.00 $125.00 $9,375.00$150.00 $118,800.00 $70.00 $55,440.00$300.00 $16,500.00 $150.00 $8,250.00$20.00 $121,160.00 $16.00 $96,928.00This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information. ITEM COST ITEM COSTBid Summary Washington-Chapman Railroad Crossing Improvements Page 4 of 6Printed 10/31/2022 @ 5:11 PM