My WebLink
|
Help
|
About
|
Sign Out
Home
12a Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 12052022
>
12a Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 3:26:34 PM
Creation date
12/15/2022 4:15:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/5/2022
Retention
PERM
Document Relationships
Ord 2022-014 Building Code Update
(Amended)
Path:
\City Clerk\City Council\Ordinances\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1803.8 Review. Before issuing a permit for a building where soil and foundation <br />investigation is required, the Geotechnical Engineer or Civil Engineer in responsible charge <br />of the soil investigation shall state in writing (must be signed and stamped): <br />1. The plans and specifications substantially conform to the recommendations in the soil <br />investigation. <br />2. The Geotechnical Engineer or Civil Engineer in responsible charge of the soil investigation <br />has been retained to provide soil site observation and provide periodic and final reports to the <br />city. <br />1803.9 Field Report. Before requesting a foundation inspection from the City, the <br />Geotechnical Engineer or Civil Engineer in responsible charge of the soil investigation shall <br />provide a written field report stating: <br />1. The building pad was prepared and compacted in accordance with the soil report and <br />specification. <br />2. The foundation or pier excavation, depth, backfill materials, and drainage (if applicable), <br />substantially conforms with the soil report and approved plans. <br />1803.10 Final Report. Before final inspection for any building or structure, the <br />Geotechnical Engineer or Civil Engineer in responsible charge of the soil investigation shall <br />issue a final report stating the completed pad, foundation, finish grading, drainage, and <br />associated site work substantially conforms to the approved plans, specifications, and <br />investigation. <br />7-5-180 CONCRETE AND MASONRY FOUNDATION WALLS. <br /> Section 1807.1.6 of the 2022 California Building Code is amended to read as follows: <br />1807.1.6 Prescriptive design of concrete and masonry foundation walls. Concrete and <br />masonry foundation walls that are laterally supported at the top and bottom shall be <br />permitted to be designed and constructed in accordance with this section. Prescriptive <br />design of foundation walls shall not be used for structures assigned to Seismic Design <br />Category D, E or F. <br />7-5-185 MODIFICATIONS TO ACI 318. <br /> The last paragraph of Section 1905.1.2 of the 2022 California Building Code is amended to <br />read as follows:
The URL can be used to link to this page
Your browser does not support the video tag.