My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Kimley-Horn Wick Blvd & Manor Blvd Signal Signed.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
CSA Kimley-Horn Wick Blvd & Manor Blvd Signal Signed.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 12:05:12 PM
Creation date
12/18/2022 11:37:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Consulting Services Agreement between City of San Leandro and Last revised 08/17/2020 <br />Kimley-Horn and Associates, Inc. for Wicks Boulevard and Manor Boulevard Signal Upgrade Project <br /> Exhibit A – Page 2 of 6 <br /> <br />Consultant will conduct the utility coordination task using contact information furnished by the City. <br />Consultant will request and gather information from utility companies with facilities in the project area. <br />These utilities will likely include PG&E, telephone, cable television, water, storm drain, and sanitary sewer <br />facilities. <br /> <br />Prior to the development of the 70% PS&E documents, Consultant will develop the base plans for the <br />project intersection. This includes developing the base maps and utility information based on information <br />received from the City and utility companies, and the existing topographic survey of the intersection. <br /> <br />Once the Base Plan is complete, Consultant will begin the preparation of a technical memorandum. The <br />technical memorandum will serve to document not only the design assumptions but will also include a 30% <br />preliminary design and estimate of construction costs. The preliminary design will show all existing <br />elements and the location of proposed improvements such as traffic signal infrastructure (poles, signal <br />heads, pull boxes, conduits), curb ramps, and striping elements. The purpose of the memorandum is to <br />inform and seek approval of the initial design elements prior to preparation of the 70% design plans. <br /> <br />Consultant will conduct an LED safety lighting photometric analysis of the intersection based on current <br />standards and guidelines. The purpose of this analysis will be to determine the appropriate level of lighting <br />at the intersections and identify ideal placement for LED luminaires at the intersection. Consultant will <br />complete the analysis using AGI 32 software tool. Upon completion, Consultant will provide the City with <br />the analysis results, and discuss lighting design implications. <br /> <br />Consultant will attend a design review meeting to discuss design direction and next steps. <br /> <br />Task 2.0 Deliverables: <br />• PDF of Preliminary Design Technical Memorandum <br />• Initial Photometric Analysis <br />• Preliminary Cost Estimate <br /> <br />Task 3.0 Design Development <br />Task 3.1 Develop 70% Plans, Specifications, and Estimate (PS&E) <br />Based on feedback from City staff on the Preliminary Design Technical Memorandum, Consultant will begin <br />the preparation of the 70% design level plans, specifications, and opinions of probable cost (PS&E) for the <br />project improvements. The plans will be prepared in AutoCAD format and submitted to the City in PDF at <br />half scale. Consultant will utilize the City standard plan sheet borders with title block and general <br />construction notes and CAD standards. <br /> <br />The anticipated breakdown of sheets for the 70% plans is as follows: <br />• Cover Sheet - General Notes, Project Location Map, Sheet Index, Benchmark, and Legend [1 sheet] <br />• Civil Improvements Plan [2 sheets] <br />• Utility Plan [1 sheet] <br />• Signal Modification Plan [1 sheet] <br />• Signing and Striping Plan [1 sheet] <br />• Lighting Plan [1 sheet] <br />DocuSign Envelope ID: B4204E81-4772-4825-9AC6-8CAAA2F14ED1DocuSign Envelope ID: AFD99D1E-CF78-4D5D-B661-1ECF4E55BEDD
The URL can be used to link to this page
Your browser does not support the video tag.