My WebLink
|
Help
|
About
|
Sign Out
Home
EBCE-San_Leandro_EV_Charger_Site_License_Agreement_Final.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
EBCE-San_Leandro_EV_Charger_Site_License_Agreement_Final.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 12:05:13 PM
Creation date
12/18/2022 11:41:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 1 <br />Execution Version <br />CHARGING STATION LICENSE AGREEMENT <br />This Charging Station License Agreement (“Agreement”) is entered into as of the __7th___ day <br />of __Nov_____, 2022 (“Effective Date”) by and between the City of San Leandro, a municipal <br />corporation (the "City") and the East Bay Community Energy Authority, a Joint Power Authority <br />("EBCE"). City and EBCE are individually referred to as “Party” and collectively as “Parties”. <br />1. Grant of License. City is the fee simple owner of certain real property located at the San Leandro Main <br />Library parking lot - 300 Estudillo Avenue, San Leandro (APN 077-0551-001-00) (the “Property”). City <br />grants to EBCE and its contractors and vendors for the Term of this Agreement: (i) an exclusive and <br />irrevocable, except as specifically set forth herein, license to use and occupy a portion of the Property, <br />including twenty-four (24) designated parking spaces for charging electric vehicles (“Charging Stalls”), as <br />more particularly described in Exhibit A, attached hereto and incorporated herein by this reference (the <br />“Premises”) for the Purpose, as defined in Section 2 below; and (ii) any necessary easements or rights <br />for installation, maintenance, operation, access and utilities for the Purpose, as designated in Exhibit A. <br />City shall not allow installation or use of charging stations other than those of EBCE on the Property. <br />2. Purpose. The Premises may be used by EBCE and its contractors and vendors for any lawful activity <br />in connection with the design, development, construction, installation, maintenance, repair, replacement, <br />removal, security, and operation of direct current fast chargers and ancillary items to fuel electric vehicles, <br />including, without limitation, electrical equipment, hardware, software, signage and all supporting <br />equipment and structures (which may include concrete pads and protective bollards) (collectively, the <br />“Charging Station”), together with any other uses permitted herein (“Purpose”), on the terms and <br />conditions set forth in this Agreement. <br />3. Term. The term of this Agreement (the “Term”) shall commence on the Effective Date and terminate <br />fifteen (15) years from the date that the Charging Station is first available to begin charging vehicles <br />(“Commencement Date”). EBCE shall provide notice to City of the Commencement Date. Following the <br />expiration of the initial Term, the Parties may mutually agree in writing to renew or extend the Term of the <br />Agreement, or absent such agreement, EBCE shall remove the Charging Stations in accordance with <br />Section 12 hereof. <br />4. Termination. This Agreement may be terminated: <br />a.by EBCE, upon thirty (30) days’ written notice to City, at any time prior to the submission <br />of the permit application for construction of the Charging Station at the Property or in the event that EBCE <br />determines that the construction or continued operation of the Charging Station is impracticable or <br />uneconomical; or <br />b.by EBCE, if any portion of the Property is condemned or taken in any manner for a public <br />or quasi-public use that could adversely affect EBCE's use of the Premises, as of the date title to the <br />condemned portion of the Property is transferred to the condemning authority. <br />c.by City, upon thirty (30) days’ written notice to EBCE, in the event the Commencement <br />Date has not occurred within fifteen (15) months following the Effective Date; provided that the foregoing <br />right shall terminate upon the Commencement Date; or <br />d by either Party if the other Party breaches or fails to perform any of its obligations under <br />this Agreement in any material respect, and such breach or failure continues uncured for ten (10) business <br />days after receipt of written notice; provided that if such breach or failure reasonably requires more than <br />ten (10) business days to cure, this provision shall not be triggered if such breaching Party commences <br />to cure within such period and diligently proceeds to complete such cure; or <br />e.by either Party, if the other Party becomes insolvent or proceedings are instituted by or <br />against it under any provision of any federal or state bankruptcy or insolvency laws. <br />DocuSign Envelope ID: 9A9D2499-76B9-48B0-8ECE-EF852438F252DocuSign Envelope ID: EC3D6FF2-1EAC-45AF-8666-F6EEFB410D6F
The URL can be used to link to this page
Your browser does not support the video tag.