Laserfiche WebLink
Execution Version <br />Exhibit B - 2 <br />● EVSE must include necessary equipment, sensors, controls, and communications as necessary <br />to support EVSE system functionality. <br />● EVSE must be capable of responding to signals to initiate, terminate, and curtail sessions as <br />necessary to enable back-office services. <br />● EVSE must be able to recognize EVSE users and initiate charging sessions by smart phone <br />application (via back-office services), EVSE hardware-specific RFID or "tap" card, and activation <br />and payment through credit card reader. <br />● Fail safe design so if there are communications issues, it defaults to a free session. <br />● Hardware must be operable with other OCPP 1.6 or higher compliant back-office services. <br />Maintenance Services and Reliability: <br />• EBCE may retain a sufficiently qualified, experienced and trained third-party contractor “to be <br />determined” to operate and maintain the Charging Stations in accordance with the terms of this <br />Maintenance and Operation Plan. Such Contractor shall be licensed and in good standing <br />throughout the Term. <br />• EBCE’s “to be determined” Contractor will operate the Charging Stations for the benefit of public <br />customers and shall use commercially reasonable efforts to maintain the Charging Stations in <br />good working order and repair. Contractor will be responsible for all M&O, which includes the <br />following requirements: <br />● Contractor must ensure all equipment is properly checked, tested, and activated for proper <br />operation. <br />● Contractor must ensure Charging Station pedestals, ancillary electrical equipment (i.e., power <br />cabinets, transformer, etc.), and signage is kept safe, clean, presentable, and usable. As the <br />site host, the City of San Leandro will be responsible for general parking facility surface <br />cleanliness. <br />● Contractor must employ a network communication system with a service provider capable of <br />monitoring the Charging Stations for any error or malfunction 24 hours a day, seven (7) days <br />a week. <br />● EBCE will require that at least 25% of the selected Contractor's team of electricians, at any <br />given time of the project, hold Electric Vehicle Infrastructure Training Program (EVIP) <br />certification. <br />● Maintenance of the EVSE shall be performed by Contractor and/or its subcontractors who <br />have the capabilities and capacity to notify and respond in the following manner and timeframe: <br />○ Upon notification of an issue or malfunction, Contractor shall immediately notify EBCE <br />of such malfunction or operating error. <br />○ In the event of an equipment or hardware malfunction or failure, a maintenance crew <br />shall respond to the site within twenty-four (24) hours from the time the issue is <br />reported and shall return station(s) to full operation and perform any necessary <br />equipment or area cleaning within forty-eight (48) hours from the time the issue is <br />reported. Maintenance crew shall return station(s) to full operation in no more than five <br />(5) days for significant or complex issues. <br />● Contractor and/or its subcontractors must stock key parts to ensure expedient response and <br />repair times. <br />● Fail-safe Charging Sessions: The charging system should be able to offer a customer charging <br />session (without human intervention), even if communication or system issues would normally <br />prevent the system from authorizing a session. <br />● Guaranteed Availability: The Contractor shall propose a detailed plan that demonstrates a <br />minimum of 97% guaranteed operational availability (as a percent of the time) for the Charging <br />Stations. If complimentary energy is dispensed from the "fail-safe Charging Session", <br />Contractor will compensate EBCE for the complementary energy (excluding the down time <br />allowed by this guaranteed availability provision). <br />● The City has no responsibility for the payment of maintenance costs, including any licenses, <br />fees, and/or taxes payable due to the operation of the Charging Stations. This responsibility <br />spans from the Effective Date through expiration of the Term. <br />DocuSign Envelope ID: 9A9D2499-76B9-48B0-8ECE-EF852438F252DocuSign Envelope ID: EC3D6FF2-1EAC-45AF-8666-F6EEFB410D6F