Laserfiche WebLink
Execution Version <br />Exhibit A - 1 <br />EXHIBIT A <br />PROPERTY AND PREMISES <br />EBCE will install 12 dual-port 150 kilowatt (kW) direct current fast chargers (“DCFC”) in 24 Charging Stalls <br />within the Premises identified in Figure 1 for the Property located at San Leandro Main Library parking lot <br />- 300 Estudillo Avenue, San Leandro (APN 077-0551-001-00). Each DCFC will be capable of powering 2 <br />Charging Stalls. The initial project design is depicted in Figure 2. The capacity of the DCFC equipment <br />may change in the final project design. <br />Per State of California requirements, 2 of the Charging Stalls will comply with the Americans with <br />Disabilities Act (“ADA”). To accommodate the van accessible ADA requirements, and DCFC equipment <br />requirements generally based on final product selection, 2-3 additional parking spaces may be needed at <br />the Property. <br />EBCE has identified that grouping the Charging Stalls together in a single area of the Property, rather <br />than distributing them throughout the parking lot, will lead to project cost efficiencies. This project design <br />will also result in a more positive user experience, easing drivers’ ability to find the Charging Stalls at the <br />Property. <br />To accommodate the electrical load of the DCFCs at the Property, EBCE will coordinate with PG&E to <br />determine if a new 2-megawatt service needs to be brought to the site. Costs related to the new electrical <br />service will be assumed by PG&E and/or EBCE. The electrical service that powers the Charging Stalls <br />will be EBCE’s Renewable 100 electricity product and EBCE will be responsible for the meter. The City <br />will not pay any costs associated with the electricity consumption from this new meter. EBCE will <br />coordinate with PG&E through their Service Planning process to confirm optimal siting of any new <br />transformers needed at this location. <br />EBCE will seek the procurement of turnkey services from a single vendor, to be selected through a <br />competitive solicitation issued by EBCE, that includes final design, equipment procurement, installation, <br />load management system, ongoing maintenance services, and back-office services (e.g., <br />communications, user account management, billing, reporting, utility interface application, etc.). The <br />vendor will be under contract with EBCE and may: <br />• Coordinate with PG&E on the installation of a new transformer and any other front of the meter <br />equipment that may be needed <br />• Install all associated wiring and conduit that enable the operation of the Charging Stalls (following <br />all applicable building codes, industry standards, and best practices) <br />• Be responsible for pouring the concrete pads on which the DCFCs will be installed and designing <br />and installing appropriate physical barriers (barrier posts, wheel stops) for structural support and <br />protection of the DCFCs <br />• Mount all equipment in front of the Charging Stalls and will take into consideration accessibility to <br />cables and plugs as well as connectivity to vehicles <br />• Be required to incorporate cable management systems in each Charging Stall to keep the charging <br />cables off the ground <br />• Ensure the installation of the DCFCs complies with ADA requirements <br />• Re-stripe the Charging Stalls as needed <br />• Provide all signage required in consultation with EBCE <br />• Procure DCFCs and incorporate load management systems <br />• Provide a credit card payment solution (i.e. kiosk) if the DCFCs procured do not have a built-in <br />credit card reader to ensure compliance with SB 454 <br />• Provide a “Final M&O Plan” for inclusion to this Agreement (Exhibit B) <br />DocuSign Envelope ID: 9A9D2499-76B9-48B0-8ECE-EF852438F252DocuSign Envelope ID: EC3D6FF2-1EAC-45AF-8666-F6EEFB410D6F