Laserfiche WebLink
File Number: 22-622 <br />Design and Bid $1,800,000 <br />Construction Contract $9,500,000 <br />Design and Construction Contingencies $1,273,000 <br />Construction Management $185,000 <br />TOTAL $12,758,000 <br />Consultant Agreement Amendment Summary <br />Amend No.Description Amount Orig. Fee % of <br />ORIGINAL CSA - DESIGN OF ANNUAL OVERLAY 19-21 $691,511 <br />1.Corrected clerical error that resulted in an incorrect $ 25,680 3.7% <br />original encumbrance. <br />2.Limit potholing work to low traffic periods.$ 55,377 8.0% <br />3.Add paving of Aurora Drive to the project, extend <br />complete street work on Hesperian from Thornally <br />to Fairmont $239,957 34.7% <br />4.Add design of complete street features on Bancroft <br />Hesperian, Grand, and Manor. Add landscape design <br />on Hesperian. Add RR permitting of road diet on <br />Hesperian.$528,584 76.3% <br />Proposed <br />5.Design revisions of striping and hardscaping on <br />Grand Avenue, the striping for Manor Blvd and a <br />video detection traffic signal on <br />Bancroft/Estudillo intersection.$122,230 17.7% <br />Agreement Amendment Total $1,663,339 140.7% <br />Attachments <br />·Att A: Amendment 5 Reso <br />·Att B: Consultant Service Agreement <br />·Att C: CSA Amendment No. 1 <br />·Att D: CSA Amendment No. 2 <br />·Att E: CSA Amendment No. 3 <br />·Att F: CSA Amendment No. 4 <br />·Att G: Scope of Services <br />·Att H: Compensation Schedule <br />PREPARED BY: Nicole Noronha Castelino, Senior Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 12/14/2022