My WebLink
|
Help
|
About
|
Sign Out
Home
2022 12 08 CSA Matrix Consulting Group - For Upload.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
2022 12 08 CSA Matrix Consulting Group - For Upload.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 12:36:51 PM
Creation date
1/3/2023 9:08:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 12/08/2022 <br />Matrix Consulting Group for Staffing Needs Assessment Page 13 of 15 <br />10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or <br />interview related to this Agreement, either orally or through any written materials. <br /> <br />10.9 Contract Administration. This Agreement shall be administered by the Police Business <br />Manager ("Contract Administrator"). All correspondence shall be directed to or through the <br />Contract Administrator or his or her designee. <br /> <br />10.10 Notices. Any written notice to Consultant shall be sent to: <br />Richard Brady, President <br />Matrix Consulting Group <br />1650 S Amphlett, Suite 213 <br />San Mateo, CA 94402 <br />650-823-3174 cell <br />rbrady@matrixcg.net <br />web: www.matrixcg.net <br /> <br />Any written notice to City shall be sent to: <br />San Leandro Police Department <br />c/o Abdul Pridgen <br />901 E. 14th St <br />San Leandro, CA 94577 <br /> <br />With a copy to: <br />City of San Leandro <br />Department of Finance <br />c/o Purchasing Agent <br />835 East 14th Street <br />San Leandro, CA 94577 <br /> <br /> <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br /> <br /> <br />_________________________________________ <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br /> <br /> <br />10.12 Integration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibits A, B, C, and D represents the entire and integrated agreement <br />DocuSign Envelope ID: F7C576A6-6297-4F13-BBC4-617E02B05036
The URL can be used to link to this page
Your browser does not support the video tag.