My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Garland DBS - Roof Projects 2022-2023 Revised.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
NPSA Garland DBS - Roof Projects 2022-2023 Revised.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 11:54:24 AM
Creation date
1/25/2023 4:34:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Non-Professional Services Agreement between November 7, 2022 City of San Leandro and Garland DBS Inc.—Exhibit A Page 2 of 6 <br />of extra work, decrease the quantity of work, or make such other changes as the City may find necessary or desirable. The contractor shall not claim forfeiture of contract by reasons of such changes by the City. Changes in work and the amount of compensation to be paid to the contractor for any extra work as so ordered shall be determined in accordance with the unit prices quoted. <br />COMMENCEMENT OF WORK: After the contract agreement has been executed by the City, a pre-construction conference will be scheduled and the Notice to Proceed shall be issued. The pre-construction conference will be held at the Public Works Services Center between the City and the Contractor. The purpose of this meeting shall be to discuss the scope of work, the plans and specifications, existing conditions, materials to be ordered, equipment to be used, and all essential matters pertaining to the prosecution of and satisfactory completion of the project as required. The Contractor shall not begin work until the Notice to Proceed is issued by the City. <br />COMPLETION OF WORK: Beginning on the first working day from the Notice to Proceed, The contractor shall have 180 working days for the completion of work. Contractor shall notify the City in writing when the work is ready for review. If deemed not ready for review, the contractor will be directed to continue. If deemed ready for review, a punch list will be prepared and issued; contractor shall allow 10 working days for punch list preparation and issuance. All items on the punch list must be completed to the City’s satisfaction before the work will be considered complete. When the City determines these items are resolved, and the work has been completed in accordance with the Contract Documents, the City will issue a Notice of Acceptance. <br />CONTRACT INCORPORATION: The Non-Professional Services Agreement (NPSA) constitutes the contract between the City and the Contractor. The parties shall not be bound by or be liable for any statement, representation, promise, inducement or understanding of any kind or nature not set forth herein. No changes, amendments, or modifications of any of the terms or conditions of the contract shall be valid unless reduced to writing and signed by both parties. <br />COOPERATION BETWEEN CONTRACTORS: The City reserves the rights to contract for and perform other or additional work on or near the work covered by these specifications. When separate contracts are let within the limits of any one project, each contractor shall conduct their work so as not to interfere with or hinder the progress or completion of the work being performed by other contractors. Contractors working on the same project shall cooperate with each other as directed. Each contractor involved shall assume all liability, financial or otherwise, in connection with their contract and shall protect and save harmless the City from all damages or claims that may arise because of inconvenience, delays, or loss because of the presence and operations of other contractors working within the limits of the same project. <br />COORDINATION WITH AGENCIES: The contractor shall coordinate their activities with the proper regulatory agencies and have their representative on site at the proper times. <br />DAMAGE: The contractor shall be held responsible for any breakage, loss of the City’s equipment or supplies through negligence of the contractor or their employee while working on the City’s premises. The contractor shall be responsible for restoring or replacing any equipment, facilities, etc. so damaged. The contractor shall immediately report to the City any damages to the premises resulting from services performed under their contract. Failure or refusal to restore or replace such damaged property will be a breach of their contract. DAYS OF WORK. All work shall be done Monday through Friday between the hours of 7:00 a.m. to 4:00 p.m. excluding designated City holidays, unless otherwise directed by a City official. The following are the designated City holidays: <br />DocuSign Envelope ID: 0FFC0D66-1724-4712-9A97-EFE1493FAA39
The URL can be used to link to this page
Your browser does not support the video tag.