My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Garland DBS - Roof Projects 2022-2023 Revised.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
NPSA Garland DBS - Roof Projects 2022-2023 Revised.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 11:54:24 AM
Creation date
1/25/2023 4:34:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Non-Professional Services Agreement between November 7, 2022 City of San Leandro and Garland DBS Inc.—Exhibit A Page 6 of 6 <br />WEEKLY MEETINGS: Contractor shall be required to meet weekly with the project supervisor or his representative to confirm the work completed, discuss any issues that may have occurred, and to review the contractor’s proposed work schedule. <br />WAGES: This contract requires the payment of prevailing wages for the State of California or the City of San Leandro Living Wage whichever is higher. Additional provisions are outlined in Exhibit D of the Non-Professional Services Agreement. <br />WARRANTY: The Contractor must provide all written manufacturer warranties from manufacturers and/or subcontractors that guarantee and warrant specific products and installations against defects in materials and workmanship for periods following acceptance of the project. <br />Warranties are specified as follows: <br />• Marina Rec Center Restoration – 15-year limited warranty <br />• Halcyon Rec Replacement – 30-year NDL warranty <br />• South Branch Library Replacement – 30-year NDL warranty <br />• South Offices Repair – 10-year material warranty <br />WASTE & RECYCLING: During performance and upon completion of work on their project contractor will remove all unused equipment and instruments of service, all excess or unsuitable material, trash, rubbish and debris, and legally dispose of same, unless otherwise directed by these specifications. Contractor shall leave entire area in a neat, clean and acceptable condition as approved by the City. Contractor is required to use the City’s franchised waste hauler, Alameda County Industries, for all on-site debris box and hauling services unless the Contractor self-hauls waste to a licensed and permitted recycling facility, transfer facility or landfill. To order debris box services contact ACI at 510-357-7282. Contractor shall demonstrate compliance with state and local construction & demolition recycling regulations by completing and submitting a Diversion Plan online with Green Halo Systems (www.greenhalosystems.com).Contractor shall create an account with Green Halo and enter project information within 30 days of purchase order issuance. Contractor shall upload recycling and disposal receipts at least once every 30 days thereafter until completion. PROPOSAL #: 25-CA-220850 AND PROPOSAL #: 25-CA-220875 INCLUDED ON FOLLOWING PAGES <br />DocuSign Envelope ID: 0FFC0D66-1724-4712-9A97-EFE1493FAA39
The URL can be used to link to this page
Your browser does not support the video tag.