Laserfiche WebLink
Amendment No. 2 to <br />Consulting Services Agreement between City of San Leandro and Wood Rodgers, Inc. 11/2/2020 <br />for Neptune Drive Flood Improvements Page 1 of 3 <br />AMENDMENT NO. 2 TO CONSULTING SERVICES AGREEMENT BETWEEN <br />THE CITY OF SAN LEANDRO AND <br />WOOD RODGERS, INC. <br />FOR <br />NEPTUNE DRIVE FLOOD IMPROVEMENTS <br />This Amendment No. 2 (“Amendment”) is made by and between the City of San Leandro (“City”) <br />and Wood Rodgers, Inc. (“Consultant”) (together sometimes referred to as the “Parties”) as of ________, <br />2021, and amends that certain Consulting Services Agreement (“Agreement”) dated March 1, 2018, <br />between the Parties. <br />WHEREAS, City and Consultant have executed the Agreement, pursuant to which Consultant has <br />provided certain consulting services to City with regard to Neptune Drive Flood Improvements, and <br />WHEREAS, the Parties desire to amend the Agreement to add to the scope, increase <br />compensation and extend the expiration date. <br />NOW THEREFORE, for good and valuable consideration, the sufficiency of which is hereby <br />acknowledged, the Parties hereby agree to amend the Agreement as follows: <br />1.Section 1.1 of the Agreement entitled “Term of Services” is hereby amended to extend the <br />term from December 31, 2020, to December 31, 2022; and <br />2.Section 2 of the Agreement entitled “Compensation” is hereby amended to pay Consultant a <br />sum not to exceed $340,155; and <br />3.Exhibit A of the Agreement entitled “Scope of Services” is hereby amended to read: <br />Add the following subtask: <br />Task 8.5 – Storm Drain Protection <br />The proposed flood wall extends over four existing corrugated metal pipe (CMP) storm drain conduits, <br />owned and maintained by Alameda County Flood Control Department. Pipe segments beneath the <br />floodwall will be replaced with a system of carrier pipes surrounded with casing pipes. The casing pipes <br />will be designed to transfer floodwall loading without impacting carrier pipes. The floodwall foundation will <br />be revised to accommodate the larger casing pipe diameters. Annular spaces between carrier and casing <br />pipes will be sealed to prevent penetration of bayside water. <br />Deliverables: Plans, specifications and estimated costs shall be incorporated into 100%. PS&E package <br />Schedule: 6 weeks after receipt of Notice to Proceed. <br />4.Exhibit B of the Agreement entitled “Compensation Schedule & Reimbursable Expenses” is <br />hereby amended to read: <br />DocuSign Envelope ID: F3F3A3C9-C0AD-4C68-8FF5-81A8437AFCB2 <br />January 29, <br />DocuSign Envelope ID: C87651BB-504C-43E7-9CE6-29CB2C49A736