My WebLink
|
Help
|
About
|
Sign Out
Home
Amendment__4__CSA_With_Nichols_Consulting_Engineers.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Amendment__4__CSA_With_Nichols_Consulting_Engineers.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 12:37:23 PM
Creation date
2/16/2023 2:45:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Amendment No. 4 to Consulting Services Agreement between City of San Leandro and Nichols Consulting Engineers for Annual Street Overlay and Rehabilitation 2019-21 Page 2 of 3 <br />Task 3E– Pavement Failures at 1105 Bancroft Design deep Pavement Repair for pavement failure due to underlying 30” pipe. <br />Task 3F – Traffic Engineering Tasks thru Fehr and Peers Traffic Counts for Grand Ave at Joaquin Ave, RRFB’s at 4 selected locations and recommendations for bike facilities at Hesperian Blvd. and Grand Ave. <br />Task 4 – Hesperian Boulevard Landscape Schematic Design Additional effort to develop the Schematic design, Draft Schematic Streetscape Master Plan, Agency Review, Final Schematic Streetscape Master Plan for the Hesperian Boulevard Landscape Design <br />Task 5 – Hesperian Boulevard Landscape Design PS&E: Additional effort to complete 70%, 100% and Bid Set plans, specifications and estimate for planting and irrigation plans for Hesperian Boulevard. <br />3.Exhibit B of the Agreement entitled “Compensation Schedule & Reimbursable Expenses” ishereby amended to include:Task 1 – Project Management & MeetingsAmendment No. 4 $126,760 Task 3 – Plans, Specs and Estimate Amendment No. 4 $239,624 Task 4 – Hesperian Boulevard Landscape - Schematic Amendment No. 4 $58,100 Task 1 – Hesperian Boulevard Landscape PS&E Amendment No. 4 $104,100 <br />Amendment No.4 $528,584 Original Contract $691,511 Amendment No. 1 $25,680 Amendment No. 2 $55,377 Amendment No. 3 $239,957 New PO Total $1,541,109 (revised) <br />4.All other terms shall remain in full force and effect. <br />This Amendment may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement. <br />SIGNATURES ON FOLLOWING PAGE <br />DocuSign Envelope ID: 719810E3-8A44-4200-820F-8A1D46504D50DocuSign Envelope ID: 1AC13D8C-72E6-4C11-BEFD-EC3DE6962B2F
The URL can be used to link to this page
Your browser does not support the video tag.