My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 1800 Williams St. 11232022
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
Agmt 1800 Williams St. 11232022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 12:06:51 PM
Creation date
3/3/2023 12:33:40 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/23/2022
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The Geotechnical Investigation Report shall be amended consistent with the elements <br />incorporated in the project plans, including, but not limited to: accurate description <br />and location of proposed improvements; detailed design of permeable paving <br />permeable asphalt pavement systems, with respect to vehicle loading, section <br />compositions and dimensions, and details for proximity to structure foundations. <br />F. Operational and Maintenance (O&M) measures shall be required for assuring that <br />storm water treatment components continue to function effectively. An O&M Plan <br />shall be provided, and an O&M Agreement shall be required. The O&M shall <br />include measures to maintain bioretention areas, permeable paver systems and <br />permeable asphalt pavement systems. <br />G. An Encroachment Permit shall be obtained from the Engineering and <br />Transportation Department for any work within the public right-of-way and the <br />following requirements shall be provided. <br />1. California Contractors license with appropriate classification for the work being <br />performed. <br />2. City of San Leandro Business License. <br />3. Insurance Certificates, (minimum requirements: General; Automotive; and <br />Worker's Compensation, each with $1 M limits; certify the City as <br />"Additionally Insured"). <br />4. Applicable permit fees and deposits shall be paid in advance. <br />H. All improvements within the public right-of-way shall be constructed in accordance <br />with the City of San Leandro Standard Plans. <br />I. Standard construction Best Management Practices (BMP's) shall be utilized during <br />construction to prevent storm water pollution as a result of the development. <br />J. Storm water runoff be prevented from discharging onto adjacent properties. Use <br />gutters, downspouts, swales, etc. to direct flow into landscaping (preferred) or <br />toward the public right-of-way. <br />K. Sanitary waste shall connect to the property's primary sewer or directly to the <br />public sewer main line. <br />L. All new utilities serving the site shall be located underground. <br />M. Water heater drain lines shall discharge to the sanitary sewer system and not to the <br />storm drain system. <br />N. Storm water pollution shall be reduced by implementing the following pollution <br />1. Structures shall be designed to discourage the occurrence and entry of pests into <br />buildings, thus minimizing the need for pesticides. <br />PLN22-0039 1800 Williams St November 7, 2022 <br />CONDITIONS OF APPROVAL Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.