My WebLink
|
Help
|
About
|
Sign Out
Home
Fehr & Peers - Crosstown Class IV Corridors - CSA.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Fehr & Peers - Crosstown Class IV Corridors - CSA.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 11:53:54 AM
Creation date
3/15/2023 4:02:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 03/22/2021 Fehr & Peers for Crosstown Class IV Corridor Study Exhibit A – Page 8 of 9 <br />Based on comments received at presentation to policymakers and during the public comment period, the Consultant will finalize the draft Plan document based on one consolidated set of comments. The Consultant shall provide one electronic pdf file and five (5) bound hard copies. Deliverables o Final Crosstown Class IV Corridor Study in electronic format <br />o Five (5) bound hard copies of Final Study 3.6 BART-Area Access Studies The Consultant will develop recommendations to integrate the Crosstown Class IV Corridors with San Leandro’s existing and future walking and biking network, serving both BART station areas. This will be summarized on a map-based figure for each station area and a corresponding table of projects. Williams Street to San Leandro BART and Downtown San Leandro: This will include connections to BART via Alvarado Street and San Leandro Boulevard. We will use the 2020 BART Walk and Bicycle Network Gap Study as springboard as well as recommendations from the East Bay Greenway PS&E and San Leandro Complete Streets Safety Assessment. This could include consideration of Williams Street east of San Leandro Boulevard to connect to downtown San Leandro and the Bancroft Avenue corridor. Bancroft Avenue to Bayfair BART: This will focus on connections via Hesperian Boulevard, where Class IV separated bikeways are proposed to connect with Bay Fair BART. This will consider the recommendations from the ongoing E. 14th/Mission Boulevard Multimodal Corridor Study led by Alameda CTC. It will employ the recommendations of the 2018 Bay Fair TOD Specific Plan as a springboard and gather additional input through the Task 1 Community Engagement. The focus will be on safe biking and walking connections to BART. Deliverables o Draft and final map and table of recommendations connecting the project extents to each BART Station. 3.7 Present to Policy Makers The Consultant will attend and present the draft and final Crosstown Class IV Corridors Study at up to four (4) commission/committee or council meetings. Feedback from these meetings will be incorporated into the final Study. The Consultant will prepare up to two PowerPoint presentations and deliver the presentations at up to four (4) meetings. Deliverables <br />o Two (2) PowerPoint presentations (one for the working sessions, one for the final meeting) <br />DocuSign Envelope ID: 914D7F6A-581B-4E79-A4DE-D435448A26ACDocuSign Envelope ID: 1D2C789B-A43C-4C90-8258-3971B5F628E3
The URL can be used to link to this page
Your browser does not support the video tag.