My WebLink
|
Help
|
About
|
Sign Out
Home
EcoEngineers_CSA_RNG Offtake RFP Support_03102023.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
EcoEngineers_CSA_RNG Offtake RFP Support_03102023.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 11:53:42 AM
Creation date
3/20/2023 1:11:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 3/3/2023 <br />EcoEngineers for RNG Offtake RFP Support Exhibit A – Page 1 of 1 <br /> <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br />Task 1: RNG Offtake RFP & Consulting <br />1. Outline offtake strategies that can help revenue risk mitigation. <br />2. Outline common commercial terms for Wastewater Treatment Gas RNG projects. <br />3. Develop and disseminate a term sheet request: <br />a. Review offtake/end-use options, potential contracting scenarios, and typical terms and <br />conditions required. <br />b. Develop and share term sheet request and send to 5-10 potential offtake partners to <br />determine level of interest and basic terms. <br />4. Offtake partner(s) selection: <br />a. Review, analyze, and evaluate each offtake bid and provide summary comments on each. <br />b. Work with the production facility to understand the financial implications for each <br />offtake to overall project revenues. <br />c. Assist the production facility with analysis to select preferred partners. Setup phone calls <br />or meetings with each preferred partner. Answer questions to help the production <br />facility select offtake partner. <br />d. Assist with contract review of offtake agreement. <br />5. Gas marketing (if separate from RNG offtaker) <br />a. Contact potential physical gas marketers to sell natural gas produced by the facility. <br />b. Contact third-party gas schedulers to solicit benefits and costs; assist in determining if <br />it wants to outsource gas scheduling tasks or complete in-house. <br />6. Other offtake questions, as requested. <br /> <br />PROJECT TIMELINE <br />The project shall commence with an SOW contract and shall be substantially complete <br />according to the proposed timeline below. The actual timeline and substantial completion date <br />may vary depending on acts or circumstances beyond the reasonable control of EcoEngineers, <br />including, without limitation, those described in the MSA. <br /> <br />Timeframe Task Description of Activities to be Completed Days from NTP <br />30 – 90 days 1 RNG Offtake RFP & Consulting 30 – 90 days <br /> <br />PROJECT DELIVERABLES <br />The final deliverables will be the following: <br /> <br />Task Final Deliverable Description <br />1 RNG Offtake Term Sheet for Distribution <br /> <br />DocuSign Envelope ID: E27AA4EE-D1CC-4368-ACC1-941384D0B8CA
The URL can be used to link to this page
Your browser does not support the video tag.