Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised 2023 <br />Cal Engineering and Geology for Lake Chabot Rd Upslope Storm Repair Exhibit A – Page 3 of 3 <br /> <br />100% PS&E <br />After City 60% review comments are received, consultant shall schedule a meeting with the <br />City to discuss comments and review stabilization concepts. The PS&E shall then be <br />developed to the 100% level. <br /> <br />100% Deliverables <br />• 100% Plans <br />• 100% Specifications <br />• 100% Engineer’s Estimate <br /> <br />Final PS&E for Public Bidding and Construction <br />After the City has concluded its review of the 100% PS&E submittal, Consultant will finalize <br />the plans and specifications for bidding and construction. The final PS&E package will <br />incorporate the City’s comments, as warranted after discussions with the City. <br /> <br />Schedule: <br /> <br />Task 3A – Draft Design Memo 6 weeks after Notice to Proceed <br />Task 3B – Final Design Memo 2 weeks after Draft Memo Comments received <br />Task 4 – 60% PS&E 2 weeks after Draft Memo Comments received <br />Task 4 – 100% PS&E 4 weeks after 60% comments received <br />Task 4 – Final PS&E 2 weeks after 100% comments received <br />Total 14 weeks (excluding City review time) <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 34E270C9-AF0A-4808-80F9-847E979247FC