5.00 <br />Contractor's Price Proposal - Detail <br />San Leandro - Tennis Court Resurfacing <br />108351.00 <br />CA-R5-GB02-123021-NCMIQC Master Contract #: <br />Work Order #: <br />Owner PO #: <br />Title: <br />Re: <br />November 20, 2022Date: <br />Proposal Value: <br />Contractor: Newton Construction & Management <br />$406,754.27 <br />(Excludes)Equip. MaterialLabor <br />Line TotalDescriptionUOMMod.ItemSect. <br />Washington <br />01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible <br />costs as directed by Owner. Insert the appropriate quantity to adjust the base <br />cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, <br />list each one separately and add a comment in the "note" block to identify the <br />Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended <br />warranty, expedited shipping costs, etc.). A copy of each receipt shall be <br />submitted with the Price Proposal. <br />1 $8,755.97EA <br />Installation =x x 8,755.97 <br />FactorUnit PriceQuantity Total <br /> 1.00 1.1000 7,959.97 <br />2% Bond Fee, for Washington Manor Park. <br />01 22 20 00 0023 LaborerFor tasks not included in the Construction Task Catalog® and as <br />directed by owner only. <br />2 $1,393.58HR <br />Installation =x x 1,393.58 <br />FactorUnit PriceQuantity Total <br /> 75.41 1.1550 16.00 <br />Used to flood entire court areas at Washington Manor Park with water and mark out areas of water pooling , <br />then squeegee off excess water. - See Construction Notes on Sheet 6, note 3, "Flood entire court with water <br />and then fill all low spots with Court Patch Binder and Asphalt Emulsion (Leveling Course) to ⅛” tolerance. 2 <br />men for 1 day. <br />01 22 20 00 0023 LaborerFor tasks not included in the Construction Task Catalog® and as <br />directed by owner only. <br />3 $1,393.58HR <br />Installation =x x 1,393.58 <br />FactorUnit PriceQuantity Total <br /> 75.41 1.1550 16.00 <br />Used to flood entire court areas at Washington Manor Park with water and verify areas of water pooling have <br />been eliminated, then squeegee off excess water. - See Construction Notes on Sheet 6, note 3, "Flood entire <br />court with water and then fill all low spots with Court Patch Binder and Asphalt Emulsion (Leveling Course) to <br />⅛” tolerance. 2 men for 1 day. <br />01 22 23 00 0682 20 KW, 60 Hertz Towable Diesel Powered Generator SetFuel consumption: <br />100% load – 1.6 gallons per hour, 75% load - 1.3 gallons per hour, 50% load - <br />0.9 gallons per hour. <br />4 $1,657.29MO <br />Installation =x x 1,657.29 <br />FactorUnit PriceQuantity Total <br /> 1,434.88 1.1550 1.00 <br />Used to supply power at Washington Manor Park for entire duration of project to power saws , jackhammers, <br />etc. <br />01 22 23 00 0885 4,000 PSI Pressure Washer With Full-Time Operator5 $4,021.70WK <br />Installation =x x 4,021.70 <br />FactorUnit PriceQuantity Total <br /> 3,481.99 1.1550 1.00 <br />Required to clean concrete to remove dust or debris prior to application of primer two workers using pressure <br />washers in advance of the applicators at Washington Manor Park. <br />01 22 23 00 1511 500 To 600 Gallon Water Trailer With Pump6 $1,151.60MO <br />Installation =x x 1,151.60 <br />FactorUnit PriceQuantity Total <br /> 997.06 1.1550 1.00 <br />Used to flood entire court(Washington Manor Park) with water and mark out areas of water pooling. Also used <br />for mixing products to be applied to court surfaces. Used at finish to verify no pooling of water on finished <br />courts. <br />Page 1 of 5 <br />11/20/2022 <br />Contractor's Price Proposal - Detail