Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:108351.00 <br />San Leandro - Tennis Court Resurfacing <br />Washington <br />32 31 13 13 0154 4' Vinyl Cover Chain Link Fence , 9 Gauge Coiled Spring Mesh, Top And <br />Bottom Rails, 2-1/2" Line Post At 10' On Center, 3" Corner Post <br />35 $3,999.77LF <br />Installation =x x 3,999.77 <br />FactorUnit PriceQuantity Total <br /> 34.63 1.1550 100.00 <br />Washington Manor Park - Install 4'-high chain link divider between top and <br />bottom courts with 3' openings between courts. <br />See sheets 9 and 10. <br />32 31 13 13 0182 16' Full Height Fabric Galvanized Chain Link #9 Gauge, 1.2 Oz Coating, 2" <br />Mesh <br />36 $15,613.75LF <br />Installation =x x 12,279.73 <br />FactorUnit PriceQuantity Total <br /> 31.27 1.1550 340.00 <br />Demolition x x = 3,334.02 8.49 1.1550 340.00 <br />Washington Manor Park - Remove and replace existing 16-foot-high chain link fencing on west and south <br />sides of <br /> tennis courts using existing posts. See Attachment A, TS-4. <br />$406,754.27Subtotal for Washington <br />Proposal Total <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub-totals and the proposal total is due to rounding. <br />$406,754.27 <br />The Percentage of NPP on this Proposal:% <br />Page 5 of 5 <br />11/20/2022 <br />Contractor's Price Proposal - Detail