Laserfiche WebLink
BID SUMMARYBID OPENINGSpencon Construction Kerex Engineering, Inc. Rosas Brothers ConstructionDATE: November 2, 20223170 Crow Canyon Pl. #250 4941 Pacheco Blvd. 4731 Coliseum WayTIME: 3:00 P.M.San Ramon, CA 94583 Martinez, CA 94553 Oakland, CA 94601LOCATION: City Clerk's OfficePhone: (925) 984-2581 Phone: (925) 387-8913 Phone: (510) 534-1077Fax: (925) 984-2583 Fax: (925) 387-0853 Fax: (510) 534-5077ITEMNO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COSTPrepared by: M. GoralkaAnnual Street Paving 2021-23Date Approved:November 2, 2022PROJECT TITLE:Curb Ramp Upgrades forPROJECT NO.:BID NO.:ENGINEER'S ESTIMATE2022.005022-23.003QUANTITY ITEM COST ITEM COST ITEM COSTBID ALTERNATE A1A. Mobilization, Staging, and Stockpiling per Section 7-8.4 and 9-3.41 LS $15,000.00 $15,000.00 $4,500.00 $4,500.00 $25,000.00 $25,000.00 $5,000.00 $5,000.002A. Temporary Traffic Control per Section 6001 LS $20,000.00 $20,000.00 $15,000.00 $15,000.00 $18,000.00 $18,000.00 $5,000.00 $5,000.003A. Curb Cut Ramp Type A or B per Section 303-5.94 EA $7,500.00 $30,000.00 $5,000.00 $20,000.00 $5,250.00 $21,000.00 $8,200.00 $32,800.004A. Curb Cut Ramp Type C or D per Section 303-5.944 EA $6,500.00 $286,000.00 $5,000.00 $220,000.00 $5,150.00 $226,600.00 $7,000.00 $308,000.005A. Dome and Landing Replacement per Section 303-5.916 EA $3,500.00 $56,000.00 $2,300.00 $36,800.00 $3,000.00 $48,000.00 $1,700.00 $27,200.006A. Gutter Replacement per Section 303-5.922 EA $1,200.00 $26,400.00 $2,500.00 $55,000.00 $3,000.00 $66,000.00 $1,200.00 $26,400.007A. Not Used -- -- -- $0.00 $0.00 $0.00 $0.008A. Sidewalk per Section 303-5.9 1100 SF $25.00 $27,500.00 $16.00 $17,600.00 $22.00 $24,200.00 $8.00 $8,800.009A. Curb and Gutter per Section 303-5.9 180 LF $115.00 $20,700.00 $95.00 $17,100.00 $100.00 $18,000.00 $60.00 $10,800.0010A. AC Tie In per Section 302-5.9 250 SF $40.00 $10,000.00 $15.00 $3,750.00 $35.00 $8,750.00 $20.00 $5,000.0011A. Concrete Valley Gutter / Apron per Section 303-5.9300 SF $38.00 $11,400.00 $40.00 $12,000.00 $34.00 $10,200.00 $40.00 $12,000.0012A. Not Used -- -- -- $0.00 $0.00 $0.00 $0.0013A. Not Used -- -- -- $0.00 $0.00 $0.00 $0.00TOTAL BID ALTERNATE A:$503,000.00 $401,750.00 $465,750.00 $441,000.00TOTAL BASE BID:TOTAL BASE BID + ALTERNATE BID ITEM A:$2,337,050.00 $2,417,150.00$2,069,250.00$2,858,150.00$2,809,550.00$2,802,800.00$3,312,550.00 $2,471,000.00MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 2 of 6Printed 11/3/2022 @ 5:11 PM