My WebLink
|
Help
|
About
|
Sign Out
Home
10A Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230320
>
10A Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 9:43:29 AM
Creation date
5/31/2023 11:38:54 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/20/2023
Retention
PERM
Document Relationships
Reso 23-023 CSA with WRT Design
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRT | RFP No. 60149: San Leandro Comprehensive Parks Master Plan 41 <br /> | i <br />MASTER/TOD/SPECIFIC AREA PLANNING <br />BART del Norte TOD and Complete Street, El Cerrito <br />Castro Valley Marketplace, Alameda County <br />South Richmond Transportation Connectivity Plan, <br />Richmond <br />San Pablo Avenue Streets/Pedestrian Connectivity, San <br />Pablo <br />Point Potrero Marine Terminal Reconstruction, Port of <br />Richmond <br />Silicon Valley Rapid Transit BART Extension, Fremont, <br />Milpitas, San Jose, Santa Clara <br />Dupond Preliminary Specific Plan, Antioch <br />Millbrae BART TOD Specific Plan, Millbrae <br />Hercules Waterfront Development, Hercules <br />BART Redevelopment Walnut Creek Transit Village, <br />Walnut Creek <br />MULTI-MODAL IMPROVEMENTS <br />Third Street Rehabilitation, San Rafael <br />Miller Avenue Streetscape, Mill Valley <br />Contra Costa Boulevard, Pleasant Hill <br />Centra Avenue, El Cerrito <br />Poplar Street Green Street Improvements, Half Moon <br />Bay <br />San Pablo Avenue Rehabilitation, Pinole <br />Sir Francis Drake Boulevard Improvements, San <br />Anselmo <br />Cutting Boulevard Rehabilitation, Richmond <br />Bay Trail, Hercules <br />Main Street Complete Street, Hayward <br />Nevin Avenue Complete Street, Richmond <br />MacDonald Avenue, Richmond <br />EDUCATION <br />B.S. Civil Engineering, San Jose State University <br />REGISTRATION <br />Professional Civil Engineer <br /> -California - No 58660 <br />Professional Traffic Engineer <br /> -California - No 2953 <br />PRESENTATIONS <br />“Deploying Broadband Networks for Public Agencies” <br />American Public Works Association, 2021 <br />“Designing Smart Cities” American Planning Associa- <br />tion, 2019 <br />“Designing Complete and Green Streets” Stanford <br />University 2016 <br />Robert specializes in developing private and public infrastructure projects deliv- <br />ering more than $200 million in construction valuation over the last 10 years. <br />Engaged throughout the life of the project, his experience ranges from conceptual design to detailed engineering <br />culminating in final construction. Robert coordinates the design effort of the team, public agencies, community <br />organizations, and private parties resulting in consensus based solutions delivered on schedule and budget. <br />ROBERT STEVENS <br />PE, TE, LEED AP <br />PRINCIPAL CIVIL ENGINEER
The URL can be used to link to this page
Your browser does not support the video tag.