Laserfiche WebLink
4 <br /> <br />1, BART capital projects, AC Transit Service Plan Update, BRT expansion, Alameda <br />County San Lorenzo Creekway Master Plan, 2009 BART Station Access Improvement <br />Plan, 2023 BART Metro: 2030 And Beyond). <br />o Parking Resource Assessment: Assessment of existing parking supply and demand, <br />including analysis of leases, to inform comprehensive district-wide parking <br />management plan. <br />o Detailed Utility Analysis: Detailed assessment of existing public and private <br />infrastructure (e.g., power, water, sewer, stormwater, high speed internet) and its ability <br />to accommodate changes generated by potential development plan demands <br />including a range of scenarios to inform utility concept plan. <br />o Resilience & Climate Adaptation: Resilience and climate adaptation concerns and <br />opportunities, including detailed site grading and flood zone analysis and <br />recommendations to inform preliminary grading plans. <br />Task 3 Deliverables: <br />3.1 Administrative Draft Existing Conditions Report and/or Technical Memos on the existing conditions, <br />opportunities, constraints, and framework. <br />3.2 Existing condition base maps of the plan area for topics identified in the scope of work. <br />3.3 Final Existing Conditions Report and/or Technical Memos on above-listed topics. <br /> <br />TASK 4 – STRATEGIES AND TECHNICAL MEMORANDA <br />Strategy Report and Technical memos to provide analysis and preliminary strategies as inputs for <br />Charrette & development of Precise Plan. <br />o Housing Affordability and Production Strategy <br />o Jobs and Housing Strategy <br />o Equity Strategy <br />o Market and Implementation & Phasing Strategy <br />o Mobility Strategy <br />o Key connections from BART to: <br /> ACTC East Bay Greenway Multi-Modal Phase 1 / E. 14th Street future BRT <br />across Estudillo Canal through BART TOD and mall site <br /> Hesperian Blvd. through BART TOD site <br /> Alameda County San Lorenzo Creekway trail network <br />o Multi-Modal Network Concept, Street Typologies, Details, and Sections <br />o District-wide Parking Management and TDM Strategy <br />o BART Parking Replacement Scenarios <br />o Intersection Improvements <br />o Public Realm <br />o Open Space <br />o Curb Management <br />o Private Infrastructure Development and Capital Improvement Plan <br />o Resilience and Climate Adaptation Strategy, including Microgrid & green infrastructure <br />opportunities