Laserfiche WebLink
6 <br /> <br />o Recommendations for stakeholder review and input <br />o Alternatives survey tool for public / decision making tool for stakeholders. <br />Task 5 Deliverables: <br />5.1 Multi-Day Working Charrette Studio – Facilitation and Production <br />5.2 Admin Draft Precise Plan Alternatives Analysis Report <br />5.3 Survey tools for public & stakeholders <br />5.4 Summary of stakeholder & public Input <br />5.5 Final Draft <br /> <br />TASK 6 – DETAILED DEVELOPMENT PLAN AND PARCELIZATION PLAN <br />• Final Development Plan and Parcelization Plan, including: <br />o Development Plan <br /> Development Program <br /> Parcelization Plan <br /> Phasing Plan <br />o Multi-Modal Circulation and Station Access Plan, including: <br /> Key connections from BART to: <br /> ACTC East Bay Greenway Multi-Modal Phase 1 / E. 14th Street future <br />BRT across Estudillo Canal through BART TOD and mall site <br /> Hesperian Blvd. through BART TOD site <br /> Alameda County San Lorenzo Creekway trail network <br /> Multi-Modal Network Typology, Details, and Sections <br /> Curbside Management Plan <br />o Public Realm Standards and Guidelines <br /> Landscape Concept Plan <br /> Street Lighting Standards <br /> Parks and Open Space Plan <br /> Public Art Plan <br /> Signage and Wayfinding Plan <br />o Infrastructure Plan <br /> Existing Topography Plan <br /> Existing Utilities Plan <br /> Preliminary Grading Concept Plan <br /> Preliminary Green Infrastructure/Stormwater Concept Plan <br /> Preliminary Utility Concept Plan <br />o Supporting Graphics <br /> Site Sections <br /> Illustrative Aerial Perspective View at Build Out